|
•
<br />Indian River County 1 Impact Fee Update Study
<br />s
<br />Table C-13
<br />Construction Cost — Recent County Road Improvements in Indian River County
<br />•
<br />Project q
<br />05013
<br />Description
<br />17th Lane SW
<br />I I
<br />From
<br />27th Ave
<br />To
<br />20th Ave
<br />Bid Year �l
<br />2008
<br />Status
<br />Com•leted
<br />Feature
<br />��
<br />2 to 3 Lanes.'
<br />Design
<br />, Urban '\
<br />gth
<br />(Mion iles)
<br />0.52
<br />Lanes
<br />Added
<br />1
<br />Lane
<br />Miles
<br />Added
<br />0.52
<br />Way Cost
<br />-
<br />Construction
<br />5525,000
<br />Construction
<br />Cost per Lane
<br />51,009,615
<br />06026
<br />20th Ave SW
<br />21st St SW
<br />17th Lane SW
<br />2008
<br />Com • leted
<br />1U to 2D Lanes
<br />Urban •
<br />'" ,0.27
<br />2
<br />0.54
<br />-
<br />51,886,715
<br />$3,773,430
<br />06026
<br />20th Ave SW
<br />25th St SW
<br />21st St SW
<br />2009
<br />Com • leted
<br />0 to 2 Lanes' '
<br />Urban `
<br />, 0.25
<br />2
<br />0.50
<br />06047
<br />ColIe:e Lane Rd
<br />Extension IRSC
<br />66th Ave
<br />2009
<br />Com•leted
<br />0to2,Lane's
<br />Urban
<br />'0.50,',
<br />2
<br />1.00
<br />-
<br />51,700,000
<br />$1,700,000
<br />01014
<br />16th St
<br />66th Ave
<br />74th Ave
<br />2009
<br />Com•leted
<br />,, 0to 2;Lanes
<br />Urban
<br />1.27. ;,
<br />?., 2
<br />2.53
<br />$664,258
<br />53,109,321
<br />51,228,981
<br />06021
<br />66th Ave
<br />16th SSttI11I1�
<br />SR 60
<br />2009
<br />Com • leted
<br />°., 0 to 3 Lanes
<br />Urban
<br />0.51 '
<br />,' ':3.
<br />1.53
<br />53,758,300
<br />$2,504,423
<br />51,636,878
<br />02025
<br />53rd St
<br />LateralHCanal
<br />2010
<br />Com•feted
<br />04o4Lanes
<br />Urban
<br />2.04
<br />i4 `N
<br />8.14
<br />53,221,638
<br />$7,000,000
<br />5859,951
<br />02025
<br />53rd St
<br />Lateral H Canal
<br />Indian River Blvd
<br />2010
<br />Com•leted
<br />Oto•4 Lanes
<br />Urban `
<br />0.50
<br />4 ,
<br />.2.00
<br />51,500,000
<br />$7,605,993
<br />$3,802,997
<br />06018
<br />Oslo Rd, Ph. II
<br />43rd Ave
<br />27th Ave
<br />2011
<br />Com•leted
<br />2U to 4D Lanes
<br />.Urban;
<br />1.20
<br />3 '
<br />.3.60
<br />$4,032,257
<br />$4,531,822
<br />51,258,839
<br />05004
<br />Oslo Rd, Ph. III
<br />43rd Ave
<br />58th Ave
<br />2012
<br />:::0Froing
<br />2U to 4D Lanes
<br />Urban
<br />1.15
<br />2
<br />`2:30
<br />$245,445
<br />53,812,202
<br />$1,657,479
<br />02031
<br />66th Ave
<br />4th St
<br />16th St
<br />2012
<br />';Oii:oin:' ;.
<br />, Oto 2U/2D
<br />Rural
<br />1.50
<br />2/3
<br />5.50
<br />$765,946
<br />$6,628,935
<br />51,205,261
<br />06040
<br />66th Ave
<br />SR 60
<br />49th St
<br />2012
<br />On'bin :' :
<br />„:2 to 4 Lanes
<br />Urban r
<br />3.05
<br />2
<br />6.10
<br />10 567 637
<br />20 773 389
<br />53,405,474
<br />Total
<br />12.75
<br />34.26
<br />$24,755,481
<br />$60,077,800
<br />$1,753,584
<br />Used in Impact Fee Study?)
<br />$1,800,000
<br />(1) Source Indian River County
<br />(2) Right-of-way costs divided by construction costs
<br />(3) The weighted average construction cost per lane mile was,rounded for use_in:the impact fe '-calculation
<br />•
<br />Tindale -Oliver & Associates, Inc.
<br />January 2014
<br />Indian River County
<br />C-11 Impact Fee Update Study
<br />
|