Laserfiche WebLink
• <br />Indian River County 1 Impact Fee Update Study <br />s <br />Table C-13 <br />Construction Cost — Recent County Road Improvements in Indian River County <br />• <br />Project q <br />05013 <br />Description <br />17th Lane SW <br />I I <br />From <br />27th Ave <br />To <br />20th Ave <br />Bid Year �l <br />2008 <br />Status <br />Com•leted <br />Feature <br />�� <br />2 to 3 Lanes.' <br />Design <br />, Urban '\ <br />gth <br />(Mion iles) <br />0.52 <br />Lanes <br />Added <br />1 <br />Lane <br />Miles <br />Added <br />0.52 <br />Way Cost <br />- <br />Construction <br />5525,000 <br />Construction <br />Cost per Lane <br />51,009,615 <br />06026 <br />20th Ave SW <br />21st St SW <br />17th Lane SW <br />2008 <br />Com • leted <br />1U to 2D Lanes <br />Urban • <br />'" ,0.27 <br />2 <br />0.54 <br />- <br />51,886,715 <br />$3,773,430 <br />06026 <br />20th Ave SW <br />25th St SW <br />21st St SW <br />2009 <br />Com • leted <br />0 to 2 Lanes' ' <br />Urban ` <br />, 0.25 <br />2 <br />0.50 <br />06047 <br />ColIe:e Lane Rd <br />Extension IRSC <br />66th Ave <br />2009 <br />Com•leted <br />0to2,Lane's <br />Urban <br />'0.50,', <br />2 <br />1.00 <br />- <br />51,700,000 <br />$1,700,000 <br />01014 <br />16th St <br />66th Ave <br />74th Ave <br />2009 <br />Com•leted <br />,, 0to 2;Lanes <br />Urban <br />1.27. ;, <br />?., 2 <br />2.53 <br />$664,258 <br />53,109,321 <br />51,228,981 <br />06021 <br />66th Ave <br />16th SSttI11I1� <br />SR 60 <br />2009 <br />Com • leted <br />°., 0 to 3 Lanes <br />Urban <br />0.51 ' <br />,' ':3. <br />1.53 <br />53,758,300 <br />$2,504,423 <br />51,636,878 <br />02025 <br />53rd St <br />LateralHCanal <br />2010 <br />Com•feted <br />04o4Lanes <br />Urban <br />2.04 <br />i4 `N <br />8.14 <br />53,221,638 <br />$7,000,000 <br />5859,951 <br />02025 <br />53rd St <br />Lateral H Canal <br />Indian River Blvd <br />2010 <br />Com•leted <br />Oto•4 Lanes <br />Urban ` <br />0.50 <br />4 , <br />.2.00 <br />51,500,000 <br />$7,605,993 <br />$3,802,997 <br />06018 <br />Oslo Rd, Ph. II <br />43rd Ave <br />27th Ave <br />2011 <br />Com•leted <br />2U to 4D Lanes <br />.Urban; <br />1.20 <br />3 ' <br />.3.60 <br />$4,032,257 <br />$4,531,822 <br />51,258,839 <br />05004 <br />Oslo Rd, Ph. III <br />43rd Ave <br />58th Ave <br />2012 <br />:::0Froing <br />2U to 4D Lanes <br />Urban <br />1.15 <br />2 <br />`2:30 <br />$245,445 <br />53,812,202 <br />$1,657,479 <br />02031 <br />66th Ave <br />4th St <br />16th St <br />2012 <br />';Oii:oin:' ;. <br />, Oto 2U/2D <br />Rural <br />1.50 <br />2/3 <br />5.50 <br />$765,946 <br />$6,628,935 <br />51,205,261 <br />06040 <br />66th Ave <br />SR 60 <br />49th St <br />2012 <br />On'bin :' : <br />„:2 to 4 Lanes <br />Urban r <br />3.05 <br />2 <br />6.10 <br />10 567 637 <br />20 773 389 <br />53,405,474 <br />Total <br />12.75 <br />34.26 <br />$24,755,481 <br />$60,077,800 <br />$1,753,584 <br />Used in Impact Fee Study?) <br />$1,800,000 <br />(1) Source Indian River County <br />(2) Right-of-way costs divided by construction costs <br />(3) The weighted average construction cost per lane mile was,rounded for use_in:the impact fe '-calculation <br />• <br />Tindale -Oliver & Associates, Inc. <br />January 2014 <br />Indian River County <br />C-11 Impact Fee Update Study <br />