My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
01/22/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 4:01:18 PM
Creation date
1/19/2016 1:58:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
01/22/2014
Meeting Body
Board of County Commissioners
Subject
Impact Fee Update Study Workshop
Tindale-Oliver & Associates, Inc.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County 1 Impact Fee Update Study <br />This Appendix provides a summary of building and land value estimates for all impact fee <br />program areas with the exception of transportation and educational facilities. Information <br />related to transportation cost estimates is included in Appendix C and cost estimates for <br />educational facilities is included in Appendix G. <br />Building Values <br />For all of the program areas, the following information was" -reviewed to estimate building <br />values: <br />• Recent construction completed by Indian,River County;(if'any); <br />• Estimates for any planned facilities; <br />• Insurance values of existing facilities;;: / <br />• Data from other jurisdictions for recentlyscompleted<facilities, and- <br />• Discussions with architects/contractors. \s/- <br />The <br />\/ <br />The following paragraphs provide a summary for each program area. <br />Correctional Facilities <br />As presented in Table: F-1, the""construction`cost associated with the County's most recent <br />jail addition (completed :in 2008) was $288: per square foot. There are no estimates <br />available: for= future jail additions,. and'the insurance values of the existing jail buildings <br />ranged .from $140 to.$220 -per square foof._-,,It is important to note insurance values are <br />cons• <br />id'e`red to provide,estimatesbelow the full cost since they typically do not take into <br />consideration certain building components, such as foundation, architectural/design cost, <br />furniture/fixture/equipment;;security features, etc. <br />Recent jail constructionin other' Florida counties and estimates obtained from construction <br />companies and architectssuggested a range of $225 to $445 per square foot. Given all this <br />information, a unit cost of $250 per square foot for jail buildings is used in the study. This <br />figure is approximately 8 percent higher than that used in the 2005 study ($232 per square <br />foot) and 22 percent lower that the figure used in the 2007 impact fee study ($321 per <br />square foot). Given that the most recent jail construction in Indian River County was <br />completed at a cost of $288 per square foot, $250 per square foot represents a <br />conservative estimate. <br />Tindale -Oliver & Associates, Inc. Indian River County <br />January 2014 <br />F-1 Impact Fee Update Study <br />
The URL can be used to link to this page
Your browser does not support the video tag.