Laserfiche WebLink
:r- MAR 12 1986 <br />G. Change Order No. 2 - West Regional Wastewater Plant <br />The Board reviewed staff memo, as follows: <br />63 PA-UE843 <br />TO: BOARD OF COUNTY COMMISSIONERS DATE: MARCH 5, 1986 <br />TURU: MICHAEL WRIGHT <br />COUNTY ADMINISTRATOR VIA TERRANCE G. PINTO, <br />j. <br />DIRECTOR, UTILITY SERVICES <br />FROM: JEFFREY A. BOONE <br />ENGINEERING OPERA I NS MANAGER <br />REFERENCE: MARCH 3, 1986 LETTER FROM WILLIAMS, HATFIELD & STONER INC.,' <br />TO TERRANCE G. PINTO, DIRECTOR, UTILITY SERVICES AND <br />FEBRUARY 19, 1986 LETTER FROM METRO EQUIPMENT & CONSTRUCTION <br />ASSOC., TO RICHARD YATES, WILLIAMS, HATFIELD & STONER INC. <br />SUBJECT: WEST REGIONAL WASTEWATER TREATMENT PLANT - CHANGE ORDER NO. 2 <br />BACKGROUND <br />The County's new West Regional Wastewater Treatment Plant (WRWTP) is <br />scheduled for substantial completion and start up in March of 1986. - <br />During recent site inspections several change order items were identified. <br />These change order items will serve to make the plant more operable and to <br />facilitate final certification by the Department of Environmental Regulation. <br />ANALYSIS <br />Following is an outline of the ten (10) change order items with their <br />respective costs. <br />chart flow measurement device <br />6 Add lifting to lugs to grit <br />dewatering device so that a <br />trash truck can pit it up per <br />WH&S specifications <br />7 Modify dumpster provided by <br />county to drain/dewater <br />screenings, similar to grit <br />dewatering device <br />8 Add PVC "snap -off" fitting on <br />truck loading device <br />COST <br />$2630.00 <br />720.00 <br />465.00 <br />385.00 <br />4800.00 <br />no charge <br />no charge <br />no charge <br />16 <br />� � r <br />CHANGE ORDER NO. 2 <br />ITEM <br />DESCRIPTION <br />1 <br />Add rails and stairway to <br />plant drain/sludge P.S. <br />2 <br />Add screenings container <br />drain and drop box <br />3 <br />Add 4" and 8" flap valves <br />to plant drain/sludge P.S. <br />Materials Only <br />4 <br />Provide H.W.L. alarm to <br />plant lift station <br />5 <br />Provide and install circular <br />chart flow measurement device <br />6 Add lifting to lugs to grit <br />dewatering device so that a <br />trash truck can pit it up per <br />WH&S specifications <br />7 Modify dumpster provided by <br />county to drain/dewater <br />screenings, similar to grit <br />dewatering device <br />8 Add PVC "snap -off" fitting on <br />truck loading device <br />COST <br />$2630.00 <br />720.00 <br />465.00 <br />385.00 <br />4800.00 <br />no charge <br />no charge <br />no charge <br />16 <br />� � r <br />