My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/19/1986 (2)
CBCC
>
Meetings
>
1980's
>
1986
>
3/19/1986 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:01 AM
Creation date
6/12/2015 12:12:23 PM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR IS 1966 BOOK 63 rtjE 9,55 <br />General Development Utilities. Inc. <br />+�++SOUT►+BA33'31 YS"OREDRIVE 1305 ]SO•t33� <br />M+AM.. FL <br />July 24, 1984 <br />Honorable Don C. Scurlock, Jr. - Chairman <br />Indian River County Commission <br />1840 - 25 Street <br />Vero Beach, FL 32960 <br />Re: Request for Public Hearing pertaining to the General Development <br />Utilities, Inc. Service Availability and Main Fxtension Policy <br />for Vero Beach Highlands and Vero Shores Water and Sewer Division <br />Dear Mr. Scurlock: <br />Pursuant to Section 17, of a Resolution dated April 5, 1960, filed <br />for record on April 17, 1964, titled "General Development Utilities, <br />Inc. Water and Sewer Franchise" as amended, General Development <br />Utilities, Inc. hereby gives notice that the Company deems it necessary <br />to amend its Main Extension and Service Availability policy for its <br />Water and Sewer Division for Vero Beach Highlands and Vero Shores. <br />The present charges for plant capacity, main extension charges and <br />meter connection charges and those proposed are reflected below. <br />Water <br />Plant Capacity <br />Line Extension <br />Impact Fee <br />Meter Connection (3/41#) <br />Meter Connection (1") <br />Meter Connection (1�11) <br />Meter Connection (2") <br />Present <br />$ .50 per GPD <br />$ 5.00 per Front <br />Footage <br />$100.00 <br />$150.00 <br />$250.00 <br />$300.00 <br />Provosed <br />$ 1.58 per GPD <br />$ 6.51 per Front <br />Footage <br />$388.00 per ERU <br />$150.00 <br />$200.00 <br />$300.00 <br />$400.00 <br />Sewer Present Proposed <br />Plant Capacity $ .75 per GPA S 2.48 per GPD <br />Line Extension $ 12.00 per Front $ 15.77 per Front <br />Footage Footage <br />The effect on a single family residential unit with a 5/8" x 3/4" <br />Water Meter and PO feet fronting on the water and sewer mains, for <br />example, is as follows: <br />Present Proposed <br />Water $ 675.00 $1,399.00 <br />Sewer $1,222.50 $1,758.00 <br />These charges are non-recurring charges to be paid once by each <br />new customer at time of connection. <br />A document entitled "Service Availability and Main Extension <br />Policy" has been submitted to Mr. Terry Pinto Utilities Director, for <br />his review and will be submitted by him to the County Commission prior <br />to the public hearing. I am enclosing a copy for your information and <br />use with the changes underlined with present and proposed rates high- <br />lighted. <br />We request that Section 14 of the original franchise resolution <br />as amended be further amended to include the proposed increased <br />charges and that the policy set forth in the aforementioned document <br />be made a part of the franchise granted to General Development <br />Utilities, Inc. by the Board. <br />Ten copies of the application are submitted with the original for <br />distribution to the other County Commissioners, the County Attorney, <br />the County Administrator, County Clerk and Utilities Director. <br />If you have any questions, please advise. <br />Sincerely, 1 /` <br />� / 1 <br />GENERAL DEVELOPMENT UTILITIES, INC. <br />Nancy,H. Roen <br />Corporate Counsel A.,= <br />
The URL can be used to link to this page
Your browser does not support the video tag.