Laserfiche WebLink
APR 9 1986 <br />$ 0.50 <br />per <br />minute <br />BOOK <br />Actual <br />Cost <br />+ 10% <br />Survey Monuments (4"x4"x24" concrete) <br />$ 5.00 <br />each <br />EXHIBIT A <br />Travel - Automobile/Truck - Out of Town <br />$ 0.35 <br />per mile <br />BOYLE ENGINEERING CORPORATION <br />Actual <br />Cost <br />+ 10% <br />Orlando, Florida <br />Actual <br />Cost <br />+ 10% <br />FEES FOR PROFESSIONAL SERVICES <br />Actual <br />Cost <br />Standard Hourly Rates <br />Soils Investigation and Field Tests <br />Actual <br />- <br />November 1, 1985 thru April 30, <br />1986 <br />Engineers, Planners, Landscape Architects, Geologists, <br />Scientists: <br />Principal <br />$74.00'per <br />hour <br />Senior II <br />$67.00 <br />per <br />hour <br />Senior I <br />$57.00 <br />per <br />hour <br />Associate <br />$47.00, <br />per <br />hour <br />Assistant II <br />$39.00 <br />per <br />hour. <br />Assistant I. <br />$35.00 <br />per <br />hour <br />Construction Administration Personnel: <br />Resident Engineer <br />$57.00 <br />per <br />hour <br />Senior Resident Project Representative <br />$47.00 <br />per <br />hour <br />Resident Project Representative <br />$39.00 <br />per <br />hour <br />Technical Support Staff: <br />Designer Supervisor <br />$51.00 <br />per <br />hour <br />Senior Technician/Senior Designer <br />$45.00 <br />per <br />hour <br />Certified Engineering Technician/Designer <br />$37.00 <br />per <br />hour <br />Senior Drafter <br />$31.00 <br />per <br />hour <br />Drafter <br />$25.00 <br />per <br />hour <br />Technical Typist (incl. Word Process Equip.) <br />$25.00 <br />per <br />hour <br />Clerical <br />$20.00 <br />per <br />hour <br />Surveying Staff: - <br />Senior Land Surveyor (Registered) <br />$55.00 <br />per <br />hour <br />Associate Land Surveyor (Registered) <br />$40.00' <br />per <br />hour <br />Survey Technician <br />$31.00 <br />per <br />hour <br />Three -Man Survey Party(includes local travel <br />$68.00 <br />per <br />hour <br />Two -Man Survey Party and all basic equipment) <br />$55.00 <br />per <br />hour <br />Electronic Distance Measuring Equipment <br />$ 8.00 <br />per <br />hour <br />Direct Project Expenses: <br />Long Distance Telephone <br />$ 0.50 <br />per <br />minute <br />Printing and Blueprinting <br />Actual <br />Cost <br />+ 10% <br />Survey Monuments (4"x4"x24" concrete) <br />$ 5.00 <br />each <br />Travel - Automobile/Truck - Out of Town <br />$ 0.35 <br />per mile <br />Travel - Other than Automobile <br />Actual <br />Cost <br />+ 10% <br />Materials Testing and In -Plant Inspection <br />Actual <br />Cost <br />+ 10% <br />Aerial Photogrammetry Service and Surveys <br />Actual <br />Cost <br />+ 10% <br />Soils Investigation and Field Tests <br />Actual <br />Cost <br />+ 10% <br />Computer Services and Computer Aided Design 'See Reverse Side <br />Rates will be adjusted twice per year. New personnel classifications <br />or new equipment may be added at any time at appropriate rates. <br />44 <br />r r � <br />