My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/20/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
10/20/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 10:04:53 AM
Creation date
2/2/2016 11:42:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/20/2015
Meeting Body
Environmental Control Board
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 01 <br />DATE OF ISSUANCE: 07/28/15 EFFECTIVE DATE, 07/28/15 <br />OWNER: jndian River County <br />CONTRACTOR: Johnson -Davis Inc. <br />Project: 45th Street Canal Enclosure at 43rd Avenue <br />OWNER's Project No. 1427 <br />OWNER's Bid No. 2015011 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Eliminate one Type "E" DBI and increase the size of one Type "H" 3 -grate inlet to a Type "H" 5 - <br />grate inlet to accommodate the existing 24 -inch CMP into the inlet. <br />Purpose of Work Change Directive: <br />Authorize the work stated above and as described in the letter from Johnson -Davis, Inc., dated <br />July 24, 2015 to eliminate possible conflicts with utilities in the area. <br />Attachments: (List documents supporting change) <br />Itemized Bid Schedule of Changes, Johnson Davis Inc., letter dated July 24, 2015, Johnson -Davis <br />Cost Breakdown of Work, Cost from American Concrete Industries for Structures. <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim <br />for a Change Order based thereon will involve one or more of the following methods as defined in the <br />Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />X Unit Prices <br />❑ Lump Sum <br />Q Other: <br />Q By Change Order: <br />❑ Contractor's Records <br />El Engineer's Records <br />II Other: <br />❑ By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ ($1,048,461 <br />Substantial Completion: 0 days; <br />Ready for Final Completion: 0 days <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />AC <br />By: <br />PTED: <br />ti <br />RECOMMENDED: <br />By: <br />APPROVED: <br />I <br />By: fI Ai/ <br />CONT <br />Date: <br />CTO <br />.7/l; <br />( gnature) <br />/ i <br />ENGINE (Signatu e) <br />Date: 7/281 /,- <br />OWN <br />Date: <br />(Signature)( <br />7 /2-7 / (,j/ <br />**END OF SECTION** <br />F:1Public WorksIENGINEERING DIVISION PROJECTS\1427-45th St Canal Enclosure at 43rd AvelDesign\Work Change Directivesl#1 - Add <br />Type H in1et11427 - 45th St. Plpe Enclosure - Work Change Directive #1 072815.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.