SECTION 00948 - Work Change Directive <br />No. 2 <br />DATE OF ISSUANCE: 4/17/2015 <br />EFFECTIVE DATE: 4/17/2015 <br />OWNER: Indian River County <br />CONTRACTOR: Dickerson Florida, Inc. <br />Bid No: 2014046 <br />Project: 13th Street S.W. at 58th Avenue Bridge <br />OWNER's Contract No. 2014046 <br />ENGINEER: Indian River County <br />ENGINEER's Contract No. 0530-B <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Install 48' - 10" ADS Pipe, 10° inline drain, Type "C Inlet and other miscellaneous modifications at Station <br />102+83 on 58th Avenue connecting to Structure (S-2). <br />Install 20' - 12" CAP in the Indian River Farms Water Control District Canal at on Streets SW. <br />Cut weir into Structure (S-1) Block weir in Structure (S-2). <br />Purpose of Work Change Directive: <br />The adjacent property owner's stormwater currently drains into an existing inlet within the 58th Avenue <br />right-of-way. The road way will be higher than existing requiring a better system to collect the property <br />owner's stormwater. Side notches will also be cut into two structures to provide better drainage for the <br />property owner. <br />Attachments: <br />Plan Sheets 12 & 13 Revised 2/24/15 <br />Letter from Dickerson Florida, Inc. dated April 13, 2015 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices: Contract Times <br />II Lump Sum <br />II Other. <br />El By Work change Directive: <br />Estimated increase in Contract Price: <br />$4,261.28 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />NONE <br />II Contractor's Records <br />LJ Engineer's Records <br />Q By Change Order. <br />Substantial Completion: 150 days; <br />Ready for Final Completion: 180 days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACC. b. <br />BY <br />RECOMMENDED: <br />By: x <br />• 'P]'O - P: / / <br />B :,/i : �� <br />_ <br />= <br />CON '• C OR (Signature) <br />Date: `d" --17 -1' l <br />E G EER (Signature) <br />Date: Lf -17— 15 <br />OWNE-, ignatu -) <br />Date: /^ZZ��.f <br />F:\Public Works\ENGINEERING DIVISION PROJECFS\0530B 13th Street SW at 58th Ave Bridge\Admin\Work Change Directives \0530B - Work Change Directive <br />#2.doc <br />65 <br />N <br />