Laserfiche WebLink
SECTION 00948 - Work Change Directive <br />No. 3 <br />DATE OF ISSUANCE: 4/17/2015 EFFECTIVE DATE: 4/17/2015 <br />OWNER: Indian River County <br />CONTRACTOR: Dickerson Florida. Inc. <br />Bid No: 2014046 <br />Project: 13�Street S.W. at 58th Avenue Bridge <br />OWNER's Contract No. 2014046 <br />ENGINEER: Indian River County <br />ENGINEER's Contract No. 0530-B <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Re -align the roadway millings at Station 16+40 on 58th Avenue <br />Install 36" aluminum corrugated pipe with a flashboard riser at Station 109+60, remove the existing 24° <br />CMP at Station 109+80, and re -grade swale on Wayne Collier's property under a license agreement. <br />Purpose of Work Change Directive: <br />To correct a roadside hazards <br />Attachments: <br />Plan Sheets 14, 15, 22, 23 & 24 Revised 4/9/15 <br />Letter from Dickerson Florida, Inc. dated April 13, 2015 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices: Contract Times <br />Q Lump Sum <br />Q Other. <br />el By Work Change Directive: <br />Estimated increase in Contract Price: <br />$33,421.33 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />None <br />Q Contractor's Records <br />Q Engineer's Records <br />Q By Change Order. <br />Substantial Completion: 150 days; <br />Ready for Final Completion: 180 days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACC' - ►'• <br />By: A <br />RECOMMENDED: <br />By: �cl,_, ezc <br />AP,PRO D: <br />B��, /j� <br />CON ' • C OR (Signature) <br />Date: rq _/' <br />E GINEER (Signature) <br />Date: 11` -f 7 , f 5 <br />OWNE ,06i oma- re) <br />Date: (--2/ - i�— <br />F-\Public Works\ENGWEERING DIVISION PROJECTS\0530B 13th Street SW at 58th Ave Bridge\Admm\Work Change Directives\0530B - Work Change Directive <br />#3.doc <br />70 <br />