SECTION 00948 - Work Change Directive <br />No. 5 <br />DATE OF ISSUANCE: 5/6/2015 <br />EFFECTIVE DATE: 5/6/2015 <br />OWNER: Indian River County <br />CONTRACTOR: Dickerson Florida, Inc. <br />Bid No: 2014046 <br />Project:: 1�Street S.W. at 55th Avenue Bridge <br />OWNER's Contract No. 2014046 <br />ENGINEER: Indian River County <br />ENGINEER's Contract No. 0530-B <br />You are directed to proceed promptly with the following changes: <br />Description: Additional contract time will be added due to delays associated with negotiations with the <br />County, property owners, IRFWCD, and the Contractor. Also, time will be added for consideration of rain <br />delays. <br />Purpose of Work Change Directive: Additional contract time is required due to delays associated with <br />negotiations with the County, property owners, IRFWCD, and the Contractor for additional piping on 58 <br />Avenue and other miscellaneous work. Also, time will be added for consideration of rain delays. <br />Attachments: Letter from Dickerson Florida, Inc. dated May 6, 2015 requesting additional contract time. <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a <br />Change Order based thereon will involve one or more of the following methods as defined in the Contract <br />Documents. <br />Method of determining change in <br />Contract Prices: <br />NONE <br />❑ Lump Sum <br />❑ Other. <br />a By Work Change Directive: <br />Estimated increase in Contract Price: <br />Method of determining change in <br />Contract Times <br />0 Contractor's Records <br />0 Engineer's Records <br />El By Work Change Directive <br />Estimated increase in Contract Time: 60 calendar <br />days <br />Revised contract time: <br />Substantial Completion: 210 days; 5124115 <br />Ready for Final Completion: 240 days.6/24/15 <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />AC52PT" n: <br />Byl 1 <br />RECOMMENDED: <br />By: 1 i7.., �� <br />. ' -4,VE! J <br />By: z' / <br />// <br />COI • ' Si nature <br />F <br />Date: r? P) -I Pj <br />ENGINEER Si na ure) <br />Date: 45 - S ` %5 <br />• r NER .- .(z <br />Dat-: t (S — <br />F:\Public Woda\ENGINEERING DIVISION PROJECfSW530B 13th Street SW az 58th Ave Bridge \Mmin\Work Change Directives\0530B - Work Chage Directive <br />#5.doc <br />79 <br />