My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/20/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
10/20/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 10:04:53 AM
Creation date
2/2/2016 11:42:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/20/2015
Meeting Body
Environmental Control Board
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 6 <br />DATE OF ISSUANCE: 6/12/2015 <br />EFFECTIVE DATE: 6/12/2015 <br />OWNER: Indian River County <br />CONTRACTOR: Dickerson Florida. Inc. <br />Bid No: 2014046 <br />Project: 13th Street S.W. at 58th Avenue Bridge <br />OWNER's Contract No. 2014046 <br />ENGINEER: Indian River County <br />ENGINEER's- Contract No. 0530-B <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Supply new fence posts for the residence at the SW comer of 13th Street SW and 58th Avenue. <br />Homeowner will install. <br />Purpose of Work Change Directive: <br />To correct an abrupt driveway profile transition at 58th Avenue. The gate relocation will allow the driveway <br />to be raised. The gate location will be field determined. <br />Attachments: <br />Letter from Dickerson Florida, Inc. dated June 9, 2015. The Hydro Seeding noted in the letter will not be <br />used. <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices: Contract Times <br />❑ Lump Sum <br />Queer <br />ID By Work Change Directive: <br />Estimated increase in Contract Price: <br />$523.09 <br />None <br />Q Contractor's Records <br />0 Engineer's Records <br />Q By Change Order: <br />Current contract time: <br />Substantial Completion: 210 days: 5124/15 <br />If the change involves an Increase, the estimated Ready for Final Completion: 240 days.6/24115 <br />amount is not to be exceeded without further <br />authorization. <br />ACCEP <br />,l <br />RECOMMEN D: <br />APPROVED:���%%S <br />164491 <br />By: <br />By'iztr t� <br />By: All <br />CONTRACTORISignature) <br />E INEER (Signature) <br />OWNER (Signature) <br />Date: � l 1 r7 1 � <br />Date: � - i � �� S <br />Date: 6/03/(r <br />F:\Public WorloAENGINEER.ING DIVISION PROJECTS10530B 13th Street SW at 581b Ave BridgeAA \work Change Directives10530B - Work Maw Directive <br />#6.doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.