Laserfiche WebLink
66th AVENUE ROADWAY IMPROVEMENTS (SOUTH OF S.R. 60 TO NORTH OF 49TH STREET) <br />IRC PROJECT NOJBID NO.: 0545/2013008 <br />CHANGR ORDER No. 2 <br />Description of itemized Changes <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton Pi = Per Installation <br />CY = Cubic Yard AS = Assembly LB = Pound NM = Net Mile GM = Gross Mile PD = Per Day MH = Man Hour <br />CAUsersNwilliams NAppData \Local\Microsott\Windows \Temporary Internet FiIesContentOutlook \DA3K130071Final Itemized Schedule -0545 <br />00310-15 <br />111 <br />New 52 <br />Core 84" RCP at 41st Street <br />' 1 <br />EA <br />2127 50 <br />2,127 50 <br />New 53 <br />Adjust Control Structures Vista Plantation <br />1 <br />LS <br />3038.30 <br />3,038.30 <br />New 54 <br />New Wood Fence (Three Rail) <br />830 <br />LF <br />16.10 <br />13,363.00 <br />New 55 <br />Remove Existing Drain Sta. 275 <br />1 <br />LS <br />1150.00 <br />1,150.00 <br />New 56 <br />Catch Basin Special Grates <br />3 <br />EA <br />319 70 <br />959 10 <br />New 57 <br />Re -grade Swale at Trillium <br />1 <br />LS <br />9590 00 <br />9,590.00 <br />FORCE ACCOUNT <br />1 <br />LS <br />750,000.00 <br />750,000 00 <br />' OVERALL PROJECT TOTAL <br />$1,420,750.89 <br />$2,439,981.20 <br />TOTAL CHANGE ORDER # 2 <br />41,019,230.31 <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton Pi = Per Installation <br />CY = Cubic Yard AS = Assembly LB = Pound NM = Net Mile GM = Gross Mile PD = Per Day MH = Man Hour <br />CAUsersNwilliams NAppData \Local\Microsott\Windows \Temporary Internet FiIesContentOutlook \DA3K130071Final Itemized Schedule -0545 <br />00310-15 <br />111 <br />