My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/03/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
11/03/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:58:39 AM
Creation date
2/2/2016 12:06:47 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/03/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
66th AVENUE ROADWAY IMPROVEMENTS (SOUTH OF S.R. 60 TO NORTH OF 49TH STREET) <br />IRC PROJECT NOJBID NO.: 0545/2013008 <br />CHANGR ORDER No. 2 <br />Description of itemized Changes <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton Pi = Per Installation <br />CY = Cubic Yard AS = Assembly LB = Pound NM = Net Mile GM = Gross Mile PD = Per Day MH = Man Hour <br />CAUsersNwilliams NAppData \Local\Microsott\Windows \Temporary Internet FiIesContentOutlook \DA3K130071Final Itemized Schedule -0545 <br />00310-15 <br />111 <br />New 52 <br />Core 84" RCP at 41st Street <br />' 1 <br />EA <br />2127 50 <br />2,127 50 <br />New 53 <br />Adjust Control Structures Vista Plantation <br />1 <br />LS <br />3038.30 <br />3,038.30 <br />New 54 <br />New Wood Fence (Three Rail) <br />830 <br />LF <br />16.10 <br />13,363.00 <br />New 55 <br />Remove Existing Drain Sta. 275 <br />1 <br />LS <br />1150.00 <br />1,150.00 <br />New 56 <br />Catch Basin Special Grates <br />3 <br />EA <br />319 70 <br />959 10 <br />New 57 <br />Re -grade Swale at Trillium <br />1 <br />LS <br />9590 00 <br />9,590.00 <br />FORCE ACCOUNT <br />1 <br />LS <br />750,000.00 <br />750,000 00 <br />' OVERALL PROJECT TOTAL <br />$1,420,750.89 <br />$2,439,981.20 <br />TOTAL CHANGE ORDER # 2 <br />41,019,230.31 <br />LS = Lump Sum LF = Linear Foot EA = Each SY = Square Yard TN = Ton Pi = Per Installation <br />CY = Cubic Yard AS = Assembly LB = Pound NM = Net Mile GM = Gross Mile PD = Per Day MH = Man Hour <br />CAUsersNwilliams NAppData \Local\Microsott\Windows \Temporary Internet FiIesContentOutlook \DA3K130071Final Itemized Schedule -0545 <br />00310-15 <br />111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.