Laserfiche WebLink
6601 Avenue Roadway Improvements <br />Project No. 0545 0370 <br />Payment Application 29 <br />PR S APP <br />n TO <br />RIOD <br />T a TAL COMP E D <br />% <br />MATERIALS <br />BALANCE TO FINISH <br />SCHEDULED VALUE <br />Item No. <br />Description <br />[Unnt Quantity <br />�.. <br />Unit uric, 1 Amoun[ QUANTITY -TOTAL <br />7 t.Y••t Y'- <br />?�e'dzl�'>dad""*+.;.rttr:c'`".��1r_�StO;w;t'$�fli,' <br />;��„'�i�;F.o'4-;,���� <br />TOTAL <br />a w � <br />TOTAL , <br />I.f:'.ac <br />STOKED <br />QUANTITY ) TOTAL <br />':;4Tv'i7 <br />�y� . <br />7A l ti V11. •:..4141. ' 0 XVi o �� <br />Si=p •�E`?,4.."T.' L"Ds`.l: �s:5�..`i��i:.i�.$Y <br />. N-F;^It!7:PRO:IECT:-0646-8. STAV116+88:03:TO,STPS119+00 7; A <br />101-1 <br />MOBILIZATION <br />PROJ PHOTOGRAPHSNIDEOS 6 AERIAL PHOTO <br />LS <br />LS <br />1.00 <br />1.00 <br />50,000.00 <br />325.00 <br />50,000.00 <br />325 00 <br />1.00 <br />1.00 <br />50000.00 <br />325.00 <br />0.00 <br />0.00 <br />1.00 <br />1.00 <br />50,000.00 <br />325.00 <br />100% <br />100% <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />101-1A <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />LS <br />1.00 <br />30,000.00 <br />30,000.00 <br />1.00 <br />30,000.00 <br />0.00 <br />1.00 <br />30,000.00 <br />100% <br />0.00 <br />0.00 <br />104-10-3 <br />SEDIMENT BARRIER <br />FLOATING TURBIDITY BARRIER <br />LF <br />LF <br />2 400.00 <br />110.00 <br />1.00 <br />8.00 <br />2 400.00 <br />880.00 <br />2 270.00 <br />0.00 <br />2 270.00 <br />0.00 <br />0.00 <br />0.00 <br />2,270.00 <br />0.00 <br />2,270.00 <br />0.00 <br />_ <br />95% <br />0% <br />130.00 <br />110.00 <br />130.00 <br />880.00 <br />104-11 <br />104-15 <br />SOIL TRACKING PREVENTION DEVICE <br />EA <br />2.00 <br />2,000.00 <br />4 000.00 <br />2.00 <br />4 000.00 <br />0.00 <br />2.00 <br />4000.00 <br />100% <br />0.00 <br />0.00 <br />104-18 <br />INLET PROTECTION SYSTEM <br />EA <br />4.00 <br />80,00 <br />320.00 <br />4.00 <br />320,00 <br />0.00 <br />4.00 <br />320.00 <br />100% <br />0.00 <br />0.00 <br />108-1 <br />AS -BUILT DRAWING (BY REGISTERED SURVEYOR) <br />SURVEY CONTROL (INSTALURE-ESTABUSH) <br />LS <br />LS <br />1.00 <br />1.00 <br />2,500.00 <br />10,000.00 <br />2,500.00 <br />10 000.00 <br />1.00 <br />1.00 <br />2 500.00 <br />10 000.00 <br />0.00 <br />0.00 <br />1.00 <br />1.00 <br />2 500.00 <br />10,000.00 <br />100% <br />100% <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />108-2 <br />108-3 <br />N.P,D.E.S. PERMITTING <br />CLEARING -8 GRUBBING <br />LS <br />LS <br />1.00 <br />1.00 <br />1 000.00 <br />9 000.00 <br />1,000.00 <br />9 000.00 <br />1.00 <br />1.00 <br />1 000.00 <br />9 000.00 <br />0.00 <br />0.00 <br />1.00 <br />1.00 <br />1,000.00 <br />9,000.00 <br />100% <br />100% <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />110-1-1 <br />120-1 <br />EXCAVATION REGULAR <br />CY <br />994.00 <br />3.50 <br />3 479.00 <br />994.00 <br />3 479.00 <br />0.00 <br />994.00 <br />3 479.00 <br />100% <br />0.00 <br />0.00 <br />120-8 <br />EMBANKMENT, COMPACTED IN PLACE <br />CY <br />1,740,00 <br />4.50 <br />7 830.00 <br />_ <br />1 740.00 <br />7 830.00 <br />0.00 <br />1,740.00 <br />7,830.00 <br />100% <br />0.00 <br />0.00 <br />121-70 <br />FLOWABLE FILL <br />CY <br />100.00 <br />155.00 <br />15 500,00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0,00 <br />0% <br />100.00 <br />15,500.00 <br />160-4 <br />TYPE B STABILIZATION -(12" SUBGRADE LBR 40) <br />SY <br />1,320.00 <br />1.25 <br />1 650.00 <br />1 424.00 <br />1,780.00 <br />0.00 <br />1 424.00 <br />1,780.00 <br />108% <br />-104,00 <br />-130.00 <br />285-709 <br />10" OPTIONAL BASE GROUP 9 (TWO LIFTS) <br />SP ASPH CONCR-(TRAFF C)(SP-12.5) (1.751- - - -- - <br />SY <br />SY <br />738,00 <br />•- 738.00 <br />11.50 <br />• - 14.00 <br />8 487.00 <br />10 332.00 <br />1 278.00 <br />1 278,00 <br />14 897.00 <br />17 892.00 <br />0.00 <br />0.00 <br />1,278.00 <br />1,278.00 <br />14,897.00 <br />17 892.00 <br />173% <br />173% <br />- <br />-540.00 <br />-540.00 <br />-8,210.00 <br />-7,580.00 <br />334-1-13A- <br />334-1-138 <br />SP ASPH CONCR (TRAFF C)(SP-9.5)(1") <br />SY <br />8 600.00 <br />8,00 <br />39 800.00 <br />4 972.00 <br />29 832.00 <br />0.00 <br />0.00 <br />0.00 <br />4,972.00 <br />1,437.00 <br />4.70 <br />29,832.00 <br />12,933.00 <br />858.00 <br />75% <br />92% <br />118% <br />1,828.00 <br />119.00 <br />-0.70 <br />9,768.00 <br />1,071.00 <br />-98.00 <br />334.1-13C <br />SP ASPH CONCR (TRAFF C)(SP-9.5) (1,25") <br />SY <br />1 556,00 <br />9.00 <br />14 004.00 <br />1 437.00 <br />12,933.00 <br />339-1 <br />MISCELLANEOUS ASPHALT PAVEMENT <br />TN <br />4.00 <br />140.00 <br />580.00 <br />4.70 <br />858.00 <br />350-1-1 <br />PLAIN CEMENT CONCRETE PAVEMENT, 8 " <br />SY <br />33.00 <br />28.00 <br />924.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0% <br />33.00 <br />924.00 <br />400-0-11 <br />CONCRETE CLASS NS, GRAVITY WALL <br />CY <br />17.00 <br />500.00 <br />8 500.00 <br />14.85 <br />7,425,00 <br />0.00 <br />14.85 <br />7,425.00 <br />, 87% <br />2.15 <br />1,075.00 <br />515-1-1 <br />STEEL GUIDERAIUHANDRAIL <br />LF <br />77.00 <br />38.00 <br />2 772.00 <br />129.00 <br />4 844.00 <br />0.00 <br />129.00 <br />4,844.00 <br />168% <br />-52.00 <br />-1,872.00 <br />520-1-10 <br />CONCRETE CURB 8 GUTTER (TYPE F") <br />LF <br />2,171.00 <br />10.50 <br />22,795.50 <br />1,893.00 <br />19 876.50 <br />0.00 <br />1,893.00 <br />19,878.50 <br />87% <br />278.00 <br />2,919.00 <br />520-1-70 <br />CONCRETE CURB & GUTTER (TYPE "E") <br />LF <br />12.00 <br />12,00 <br />144.00 <br />0,00 <br />0.00 <br />0.00 <br />0,00 <br />0.00 <br />0% <br />12.00 <br />144.00 <br />522-2 <br />SIDEWALK CONCRETE, 8" THICK <br />SY <br />218.00 <br />30.00 <br />6 540,00 <br />306,89 <br />9 208.70 <br />0.00 <br />308.89 <br />9,208,70 <br />141% <br />-88.89 <br />-2,886.70 <br />523-1 <br />PATTERNED/TEXTURED PAVEMENT, CONCRETE <br />SY <br />44.00 <br />60.00 <br />2 840.00 <br />44.00 <br />2 840.00 <br />0.00 <br />44.00 <br />2,840.00 <br />100% <br />0.00 <br />0.00 <br />538-1 <br />GUARDRAIL, RESET <br />LF <br />100.00 <br />8.50 <br />850.00 <br />100.00 <br />850.00 <br />0.00 <br />100.00 <br />850.00 <br />100% <br />0.00 <br />0.00 <br />830-1-12 <br />CONDUIT SIGNALS (F61) (UNDERGROUND) <br />LF <br />313.00 <br />2.50 <br />782.50 <br />313,00 <br />782,50 <br />0.00 <br />313.00 <br />782,50 <br />100% <br />0.00 <br />0.00 <br />630.1-13 <br />CONDUIT SIGNALS(F&I) (UNDERPVMT SAWCUT) (2) " <br />LF <br />476.00 <br />9.25 <br />4 393.75 <br />475,00 <br />4 393,75 <br />0.00 <br />475.00 <br />4 393,75 <br />100% <br />0.00 <br />0.00 <br />630-1-13A <br />CONDUIT SIGNALS (FBI) (UNDERPVMT SAWCUT) (1)" <br />LF <br />475,00 <br />12.50 <br />5 937.50 <br />475.00 <br />5,937.50 <br />0,00 <br />475.00 <br />5 937.50 <br />100% <br />0.00 <br />0.00 <br />830-1-22 <br />CONDUIT SIGNALS (F) (UNDERGROUND) <br />LF <br />950.00 <br />2.10 <br />1 995.00 <br />950.00 <br />1 995.00 <br />0.00 <br />950.00 <br />1,995.00 <br />100% <br />0.00 <br />0.00 <br />832-7-1 <br />CABLE - SIGNAL (FBI) <br />PI <br />1.00 <br />7 000.00 <br />7 000.00 <br />1.00 <br />7 000.00 <br />0.00 <br />1.00 <br />7,000.00 <br />100% <br />0.00 <br />0,00 <br />633-121.1 <br />CABLE -FIBER OPTIC (F81) (UNDERGROUND) (98 FIBER) <br />LF <br />150.00 <br />6.25 <br />937.50 <br />150.00 <br />937,50 <br />0.00 <br />150.00 <br />937,50 <br />100% <br />0.00 <br />0.00 <br />835-1.11 <br />PULL 8 JUNCTION BOXES (F&I) (PULL BOX) <br />EA <br />21,00 <br />350.00 <br />7 350.00 <br />25.00 <br />8,750.00 <br />0.00 <br />25.00 <br />8,750,00 <br />119% <br />-4.00 <br />-1,400.00 <br />839-1-21 <br />ELECTRICAL POWER SERVICE (SIGNALS) <br />AS <br />1.00 <br />1275.00 <br />1275.00 <br />1.00 <br />1,275.00 <br />0.00 <br />1.00 <br />1,275.00 <br />100% <br />0.00 <br />0.00 <br />839-2-1 <br />ELECTRICAL SERVICE WIRE <br />LF <br />200.00 <br />2,15 <br />430.00 <br />200.00 <br />430.00 <br />0.00 <br />200.00 <br />430.00 <br />100% <br />0.00 <br />0,00 <br />839-3-11 <br />ELECTRICAL SERVICE DISCONNECT (F81) (POLE) <br />EA <br />1.00 <br />330.00 <br />330.00 <br />1.00 <br />330.00 <br />0.00 <br />1.0D <br />330.00 <br />100% <br />0.00 <br />0.00 <br />641-2-12 <br />PRESTRESSED CONCR POLE (FBI) (TYPE P-11 SVC POLE <br />EA <br />1,00 <br />925.00 <br />925.00 <br />1.00 <br />925.00 <br />0.00 <br />1,00 <br />925,00 <br />100% <br />0.00 <br />0.00 <br />848-1-11 <br />ALUMINUM SIGNALS POLE (FBI) (PEDESTAL) <br />EA <br />7.00 <br />810.00 <br />5 870.00 <br />7.00 <br />5 670.00 <br />0,00 <br />0.00 <br />7.00 <br />1.00 <br />5,870.00 <br />25,500.00 <br />100% <br />100% <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />649.31-103 <br />MAST ARM ASSY (F81) 150 SGL ARM W/O LUM (60') <br />EA <br />1.00 <br />25 500.00 <br />25 500.00 <br />1,00 <br />25 500,00 <br />649-31-104 <br />MAST ARM ASSY (F81) 150 SGL ARM W/O LUM (70,5') <br />EA <br />2.00 <br />32,000.00 <br />64,000.00 <br />2,00 <br />64,000.00 <br />0.00 <br />2,00 <br />84,000.00 <br />100% <br />0.00 <br />0.00 <br />649-31-119 <br />MAST ARM ASSY (F61) 150 DUAL ARM W LUM (70.5'-70.5') <br />EA <br />1.00 <br />45 000.00 <br />45 000.00 <br />1.00 <br />45 000.00 <br />0.00 <br />1.00 <br />45 000.00 <br />100% <br />0.00 <br />0.00 <br />650-51-311 <br />TRAFFIC SIGNAL (F81) (3 SECTION 1 WAY) (STD) <br />AS <br />11.00 <br />740.00 <br />8,140.00 <br />11.00 <br />8,140,00 <br />0.00 <br />11.00 <br />8 140.00 <br />100% <br />0.00 <br />0.00 <br />850-51.511 <br />TRAFFIC SIGNAL (F81) (5 SECTION 1 WAY) (STD) <br />AS <br />8.00 <br />1,200.00 <br />7,200.00 <br />8.00 <br />7,200.00 <br />0.00 <br />8,00 <br />7,200.00 <br />100% <br />0.00 <br />0.00 <br />