6015 Avenue Roadway Improvements
<br />Propct No. 0545 0370
<br />Payment Application 29
<br />Pens n110
<br />0 8 A CATION
<br />HIS
<br />PERIOD
<br />T TAL COMPLE D
<br />%
<br />MATERIALS
<br />BALANCE TO FINISH
<br />SCHEDULED VALUE
<br />Item No.
<br />Description
<br />Unit
<br />Quantity
<br />Unit Price
<br />Amount
<br />QUANTITY TOTAL
<br />0UAN111Y
<br />TOTAL
<br />QUANTITY
<br />TOTAL
<br />STORED
<br />QUANTITY
<br />TOTAL
<br />415.1.4
<br />REINFORCING STEEL
<br />LB
<br />343.00
<br />7.00
<br />2,401.00
<br />343.00
<br />2,401.00
<br />0.00
<br />343.00
<br />2,401.00
<br />100%
<br />0.00
<br />0.00
<br />339-1
<br />MISC ASPHALT PAVEMENT
<br />TN
<br />2.00
<br />270.00
<br />540.00
<br />2.00
<br />540.00
<br />0.00
<br />2.00
<br />540.00
<br />100%
<br />0.00
<br />0.00
<br />400-2-10
<br />CL II CONCRETE
<br />CY
<br />112.00
<br />280.00
<br />31 360.00
<br />127.00
<br />35,580.00
<br />0.00
<br />127.00
<br />35,560.00
<br />113%
<br />-15.00
<br />-4,200.00
<br />415-1-9
<br />REINFORCING STEEL
<br />LB
<br />19,570.00
<br />1.35
<br />26 419.50
<br />19 570.00
<br />26,419.50
<br />0.00
<br />19,570.00
<br />28,419.50
<br />100%
<br />0.00
<br />0.00
<br />530-3-3
<br />ROCK RUBBLE CANAL EXCAV AS REQUIRED SHALL BE INCL IN THE I
<br />TN
<br />1,288.00
<br />40.00
<br />50,720.00
<br />1,268.00
<br />50,720.00
<br />0.00
<br />1,268.00
<br />50,720.00
<br />100%
<br />0.00
<br />0.00
<br />715-2-117
<br />2" PVC CONDUIT
<br />LF
<br />152,00
<br />13.00
<br />1,978.00
<br />512.00
<br />6,658.00
<br />0.00
<br />512.00
<br />6,656.00
<br />337%
<br />-380.00
<br />-4,680.00
<br />IRC -U1
<br />4" DIP FM F&1
<br />LF
<br />70.00
<br />235.00
<br />16,450.00
<br />70.00
<br />16,450.00
<br />0.00
<br />70.00
<br />18,450.00
<br />100%
<br />0.00
<br />0.00
<br />IRC -U2
<br />8" PVC WM F81
<br />LF
<br />1,853,00
<br />30.00
<br />55,590.00
<br />1,761.00
<br />52,830.00
<br />0.00
<br />1,781.00
<br />52,830.00
<br />95%
<br />92.00
<br />2,780.00
<br />IRC -U3
<br />8" FLANGED DIP WM F81
<br />LF
<br />490.00
<br />150.00
<br />73,500.00
<br />180.00
<br />27,000.00
<br />0.00
<br />180.00
<br />27,000.00
<br />37%
<br />310.00
<br />46,500.00
<br />IRC -U4
<br />12" PVC WM F&I
<br />LF
<br />3,093.00
<br />50.00
<br />154,650.00
<br />3 584.00
<br />179,200.00
<br />0.00
<br />3,584.00
<br />179,200.00
<br />118%
<br />-491.00
<br />-24,550.00
<br />IRC -U5
<br />12" PVC REUSE WM F&I
<br />LF
<br />1,050.00
<br />88.00
<br />92,400.00
<br />900.00
<br />79 200.00
<br />0.00
<br />900.00
<br />79,200.00
<br />86%
<br />150.00
<br />13,200.00
<br />IRC -U8
<br />12" FLANGED DIP WM F&I
<br />LF
<br />185.00
<br />220.00
<br />40,700.00
<br />120.00
<br />26,400.00
<br />0.00
<br />120.00
<br />28,400.00
<br />65%
<br />85.00
<br />14,300.00
<br />IRC -U7
<br />TEMP BACTERIALOGICAL SAMPLING POINT
<br />EA
<br />15.00
<br />565.00
<br />8 475.00
<br />13,00
<br />7,345.00
<br />0.00
<br />13.00
<br />7,345.00
<br />87%
<br />2.00
<br />1,130.00
<br />IRC -U8
<br />4' GATE VALVE WNALVE BOX & COVER F&I
<br />EA
<br />4.00
<br />800.00
<br />3,200.00
<br />1.00
<br />800.00
<br />0.00
<br />1.00
<br />800.00
<br />25%
<br />3.00
<br />2,400.00
<br />IRC -U9
<br />8" GATE VALVE WNALVE BOX & COVER F&I
<br />EA
<br />8.00
<br />1 000.00
<br />8 000.00
<br />8.00
<br />8,000.00
<br />0.00
<br />8.00
<br />8,000.00
<br />100%
<br />0.00
<br />0.00
<br />IRC -U10
<br />8" GATE VALVE WNALVE BOX & COVER F81
<br />EA
<br />14.00
<br />1 250.00
<br />17,500.00
<br />5.00
<br />6 250.00
<br />0.00
<br />5.00
<br />8,250.00
<br />38%
<br />9.00
<br />11,250.00
<br />IRC -U11
<br />12' GATE VALVE WNALVE BOX & COVER F&I
<br />EA
<br />5.00
<br />2,300.00
<br />11 500.00
<br />10.00
<br />23,000.00
<br />0.00
<br />10.00
<br />23,000.00
<br />200%
<br />-5,00
<br />-11,500.00
<br />IRC -U12
<br />2' AUTOMATIC AIR RELEASE VALVE F&I
<br />EA
<br />5.00
<br />2,000.00
<br />10,000.00
<br />6.00
<br />12,000.00
<br />0.00
<br />6.00
<br />12,000.00
<br />120%
<br />-1.00
<br />-2,000.00
<br />IRC -U13
<br />4" AUTOMATIC AIR RELEASE VALVE F81
<br />EA
<br />1.00
<br />9,000.00
<br />9,000.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0%
<br />1.00
<br />9,000.00
<br />IRC -U14
<br />2" BLOW OFF ASMBLY F&I
<br />EA
<br />1.00
<br />1,100.00
<br />1,100.00
<br />4.00
<br />4,400.00
<br />0.00
<br />4.00
<br />4,400.00
<br />400%
<br />-3.00
<br />-3,300.00
<br />IRC -U15
<br />17"X28" METER BOX F81
<br />EA
<br />4.00
<br />850.00
<br />3,400.00
<br />4.00
<br />3 400.00
<br />0.00
<br />4.00
<br />3,400.00
<br />100%
<br />0.00
<br />0.00
<br />IRC -U16
<br />8" X 8" WET TAP ASMBLY W/8" GATE VALVE & BOX F81
<br />EA
<br />1.00
<br />4,000.00
<br />4,000.00
<br />1.00
<br />4,000.00
<br />0.00
<br />1.00
<br />4,000.00
<br />100%
<br />0.00
<br />0.00
<br />IRC -U17
<br />12' X 12" WET TAP ASMBLY W/12" GATE VALVE & BOX F81
<br />EA
<br />4.00
<br />8,500.00
<br />26,000.00
<br />5.00
<br />32,500.00
<br />0.00
<br />5.00
<br />32,500.00
<br />125%
<br />-1.00
<br />-8,500.00
<br />IRC -U18
<br />FIRE HYDRANTASMBLY
<br />EA
<br />7.00
<br />3,000.00
<br />21,000.00
<br />7.00
<br />21,000.00
<br />0.00
<br />7.00
<br />21.000.00
<br />100%
<br />0.00
<br />0.00
<br />IRC -U19
<br />FIRE HYDRANTASMBLY RELOCATE, EXISTING
<br />EA
<br />2.00
<br />1,100.00
<br />2,200.00
<br />3.00
<br />3,300.00
<br />0.00
<br />3.00
<br />3,300.00
<br />150%
<br />-1.00
<br />-1,100.00
<br />IRC -U20
<br />AERIAL CANAL CROSSING INCL PRESTR CONC BATTER PILES, CON(
<br />EA
<br />1,00
<br />55 000.00
<br />55,000.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0%
<br />1.00
<br />55,000.00
<br />IRC -U21
<br />LAWN/ROW RESTORATION (TOP SOIL & MATCH EXIST. SOD)
<br />LF
<br />4,718.00
<br />3.00
<br />14,148.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0%
<br />4,718.00
<br />14,148.00
<br />IRC -U22
<br />12" LINE STOPS
<br />EA
<br />8.00
<br />6,000.00
<br />48,000.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0%
<br />8.00
<br />48,000.00
<br />IRC -U23
<br />VALVE BOXES, ADJUST
<br />EA
<br />28.00
<br />300.00
<br />8,400.00
<br />38.00
<br />10,800.00
<br />0.00
<br />38.00
<br />10,800.00
<br />129%
<br />-8.00
<br />-2,400.00
<br />.,;!.477,14.1;'r118T>1TREETA8TA'219440:TO:STA'246+90tiw+;kSrt :{�!F:.
<br />101.1
<br />MOBILIZATION
<br />LS
<br />1.00
<br />100 000.00
<br />100,000.00
<br />1.00
<br />100 000.00
<br />0.00
<br />1.00
<br />100,000.00
<br />100%
<br />0.00
<br />0.00
<br />101-1A
<br />PROJECT PHOTOGRAPHSMDEOS 8 AERIAL PHOTOGRAPHY
<br />LS
<br />1.00
<br />800.00
<br />800.00
<br />1.00
<br />800.00
<br />0.00
<br />1.00
<br />800.00
<br />100%
<br />0.00
<br />0.00
<br />104-2
<br />PREVENTION, CONTROL, AND ABATEMENT OF EROSION & WATER P
<br />LS
<br />1.00
<br />22,000.00
<br />22 000.00
<br />1.00
<br />22,000.00
<br />0.00
<br />1.00
<br />22,000.00
<br />100%
<br />0.00
<br />0.00
<br />108-1
<br />AS -BUILT DRAWING (BY REGISTERED SURVEYOR)
<br />LS
<br />1.00
<br />4 400.00
<br />4,400.00
<br />1.00
<br />4 400.00
<br />0.00
<br />1.00
<br />4,400.00
<br />100%
<br />0.00
<br />0.00
<br />108-2
<br />SURVEY CONTROL (INSTALL/RE-ESTABLISH)
<br />LS
<br />1.00
<br />17,000.00
<br />17,000.00
<br />1.00
<br />17,000.00
<br />0.00
<br />1.00
<br />17,000.00
<br />100%
<br />0.00
<br />0.00
<br />108-3
<br />NPDES PERMITTING
<br />LS
<br />1.00
<br />2 000.00
<br />2,000.00
<br />1.00
<br />2 000.00
<br />0.00
<br />1.00
<br />2,000.00
<br />100%
<br />0.00
<br />0.00
<br />110-1-1
<br />CLEARING & GRUBBING 16.8 ACRES
<br />LS
<br />1.00
<br />32,000.00
<br />32 000.00
<br />1.00
<br />32,000.00
<br />0.00
<br />1.00
<br />32,000.00
<br />100%
<br />0.00
<br />0.00
<br />110-8
<br />PLUGGING 4" WATER WELL (DEPTH UNKNOWN)
<br />EA
<br />1.00
<br />1 700.00
<br />1 700.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0%
<br />1.00
<br />1,700.00
<br />110-7-1
<br />MAILBOX F&I SINGLE
<br />EA
<br />3.00
<br />80.00
<br />240.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0%
<br />3,00
<br />240.00
<br />120.1
<br />EXCAVATION REGULAR
<br />CY
<br />4,776.00
<br />2.20
<br />10,507.20
<br />4,776.00
<br />10,507.20
<br />0.00
<br />4,776.00
<br />10,507.20
<br />100%
<br />0.00
<br />0.00
<br />120-8
<br />EMBANKMENT, COMPACTED IN PLACE
<br />CY
<br />40,881.00
<br />5.75
<br />233,915.75
<br />44,937.00
<br />258,387.75
<br />0.00
<br />44,937.00
<br />258,387.75
<br />110%
<br />-4,258.00
<br />-24,472.00
<br />180-4
<br />TYPE B STABILIZATION -(12" SUBGRADE LBR 40)
<br />SY
<br />37 405,00
<br />1.25
<br />46 756.25
<br />38 570.50
<br />45 713.13
<br />0.00
<br />38 570.50
<br />45 713.13
<br />98%
<br />834.50
<br />1,043.13
<br />285-706
<br />8" OPTL BASE GRP 8 TWO LIFTS
<br />SY
<br />10,900,00
<br />9.25
<br />100,825.00
<br />11 808.00
<br />109,224.00
<br />0.00
<br />11,808.00
<br />109,224.00
<br />108%
<br />-908.00
<br />-8,398.00
<br />285-709
<br />10" OPTL BASE GRP 9 TWO LIFTS
<br />SY
<br />21,600.00
<br />9.25
<br />199 800.00
<br />21 310.00
<br />197 117.50
<br />0.00
<br />21 310.00
<br />197,117.50
<br />99%
<br />280.00
<br />2,882.50
<br />288.2
<br />TURNOUT CONSTRUCTION - ASPHALT
<br />SY
<br />217.00
<br />11.20
<br />2 430.40
<br />400.00
<br />4,480.00
<br />0.00
<br />400.00
<br />4,480.00
<br />184%
<br />-183.00
<br />-2,049.80
<br />327.70-1
<br />MILL EXIST ASPH PVMT 1.25" AVG
<br />SY
<br />800.00
<br />7.00
<br />5 800.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0.00
<br />0%
<br />800.00
<br />5,600.00
<br />334.1.13A
<br />SP ASPH CONCR (TRAFFIC C) (SP -12.5)(1.751
<br />SY
<br />33,300.00
<br />8.20
<br />273,080.00
<br />32,276,00
<br />284,883.20
<br />0.00
<br />32,276.00
<br />264,663.20
<br />97%
<br />_ 1,024.00
<br />8,398.80
<br />Pens n110