My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
11/17/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:47:34 AM
Creation date
2/2/2016 1:24:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/17/2015
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County <br />Emergency Services District Board of Commissioners <br />4225 43rd Avenue <br />Vero Beach, Florida 32960 <br />Telephone: (772) 226-3900 FAX: 772-567-9323 <br />Project: <br />Fire Station? Modular, 1893 90th Avenue <br />Design and Preconstruction <br />Emergency Services District <br />AMENDED WORK ORDER NO. 2 <br />FOR <br />DESIGN/BUILD AGREEMENT <br />PHASE IV <br />WITH <br />Barth Construction, Inc. <br />This Work Order No. 2 is in accordance with the existing DESIGN/BUILD AGREEMENT <br />PHASE I dated December 6, 2012 between Barth Construction, Inc (Design/Builder) and Indian <br />River County (County). <br />SECTION I — PROJECT LIMITS <br />This Work Order No. 2 outlines for the Design/Builder to perform in connection with design, and <br />preconstruction work and related design for a temporary modular building. <br />SECTION II - SCOPE OF SERVICES <br />As agreed upon between Design/Builder and County, that the Design/Builder shall provide <br />services to include; <br />• Constructing the electrical, water, fire line and sewer utility connections to the modular <br />building. <br />• Constructing the onsite storm water drainage system. <br />• Fill and grade the site including the new stabilized drive that includes 6" of asphalt <br />millings. <br />• Installing the concrete parking, including the pavement markings. <br />• Erosion control, sod and maintenance during construction and clean up. <br />The proposal from the Design/Builder is attached to this work order and incorporated herein. <br />1 <br />142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.