Laserfiche WebLink
PROJECT: UQ Prolact No.4098 <br />Indian River County <br />US 1 Utility Conflicts - Oslo Road to County Una <br />Application No. 9 RETNNAGI <br />For Period Ending: 10-21-2015 <br />Item <br />Description of Work <br />Std <br />Qty ' Unit <br />Unit <br />Price <br />Bid <br />Amount <br />Previous <br />Installed <br />Quantity <br />Previous <br />Installed <br />Amount <br />Installer! <br />Quantity <br />This Period <br />Total <br />Amount <br />This Period <br />Total <br />Quantities <br />Completed <br />Tatal <br />Amount <br />Completed <br />Percent <br />Completed <br />44 <br />Abandon / Grout 2" FM, Valve & Fittings <br />154 i LF <br />58.00 <br />51,232.00 <br />0 <br />50.00 <br />0 <br />50.00 <br />0 <br />50.00 <br />0.00% <br />45 <br />Abandon / Grout 4" FM, Valve & Fittings <br />120 <br />IF <br />$44.00 <br />55,280.00 <br />121 <br />55,280.00 <br />0 <br />50.00 <br />170 <br />55,280.00 <br />100.00% <br />46 <br />Concrete Encase 16' FM <br />40 <br />LF <br />534.00 <br />51,360.00 <br />26 <br />5884.00 <br />0 <br />50.00 <br />26 <br />588400 <br />65.0094 <br />47 <br />1C"%4" TAP SW & GV • Connect to Existing <br />1 <br />EA <br />52,245.00 <br />52,245,00 <br />7 <br />515,715.30 <br />0 <br />50.00 <br />7 515,715.00 <br />700.00% <br />48 <br />10"X10" TAP SLV & GV - Connect to Existing <br />2 <br />EA <br />54,434.00 <br />58,868.00 <br />2 <br />58,868.00 <br />0 <br />50.00 <br />2 <br />58,868.00 <br />100.00% <br />49 <br />1664" TAP SLV & GV - Connect to Existing <br />7 <br />EA <br />52,697.00 <br />518,979.00 <br />a <br />510,788.00 <br />0 <br />50.00 <br />4 <br />510,788.00 <br />57.14% <br />50 <br />16%16" TAP SLV & GV - Connect to Existing <br />a <br />EA <br />510,940.00 <br />543,750.00 <br />4 <br />543,760.00 <br />0 <br />50.00 <br />4 <br />543,760.00 <br />100.00% <br />OTHER <br />0 <br />57 <br />Survey Stake • Out <br />1 <br />L5 <br />51,858.00 <br />51,858.00 <br />1 <br />51,858.00 <br />0 <br />50,00 1 <br />51:858.00 <br />100.007. <br />52 <br />Survey As -guilts <br />1 <br />L5 <br />56,670,00 <br />56,670.00 <br />- <br />55,670.00 <br />0 <br />50.00 <br />1 <br />56.670.00 100.0076 <br />0 <br />Subtotal <br />5211,241.00 <br />0 <br />5701,342.00 <br />50.00 <br />0 <br />5701342.00 <br />86.4594 <br />C.ontigency <br />1 <br />LS <br />581,124.10 <br />581,124.101 <br />0.9398979 <br />576,248.37 <br />0 <br />50.00 <br />0.9398979 <br />576,248.37 <br />93.9976 <br />- <br />Bell restraints structures 317, 318, & 319 -$5,249.00 <br />2 <br />Explorltory digging at Young's Market Place - 51,980.00 <br />3 <br />D700ct existing 12" structure o407 - 54,317.60 <br />a <br />FM relocate .tax 641.50 - $7,076.00 <br />r <br />' <br />1 <br />6 Chlorinating and Bacterial Retesting - 56,730.17 <br />6 <br />10"x4" ARV Assembly - $8,764.32 <br />.. <br />7 <br />Deflect existing 12" (conflict 11A) • 54,317.60 <br />8 <br />2055 US1 Abandonment (Ms. Krolj- 53,130.00 <br />9 <br />Valve Box adjustments - 534,683.6R <br />TOTAL BASE BID <br />5892,365.10 <br />5777,590.27 <br />50.00 <br />5777,590.37 <br />Page 4 014 <br />