My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/01/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
12/01/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:43:41 AM
Creation date
2/2/2016 1:46:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/01/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />CONSENT <br />TO: <br />THROUGH: <br />FROM: <br />Joseph A. Baird, County Administrator <br />Christopher R. Mora, P.E., Public Works Director C""-, <br />Richard B. Szpyrka P.E., Assistant Public Works Director <br />SUBJECT: Gifford Neighborhood 45th Street Beautification Project <br />Change Order No. 1- Pipe Replacement <br />IRC Project No. 1506 <br />DATE: November 16, 2015 <br />DESCRIPTION AND CONDITIONS <br />On July 7, 2015 the Board of County Commissioners approved the award of Bid No. 2015040 in the amount <br />of $1,306,877.14 to Sunshine Land Design, Inc., for the 45th Street Beautification Project. The project <br />consists of the milling and resurfacing of 45th Street from 43rd Avenue to east of 24th Avenue, the <br />construction of new five-foot wide paved shoulders, a westbound right turn lane at 28th Court, 2,700 LF of <br />new sidewalk, existing sidewalk enhancements, curb and gutter, pavement markings, and extensive <br />landscape improvements. <br />On September 21, 2015 a metal stormwater pipe crossing 45th Street failed during a heavy rain event. Upon <br />inspection of the pipe it was determined that the entire pipe across the roadway was failing and needed <br />replacement. Review/inspection of the remaining ten stormwater pipes that cross 45th Street between 43rd <br />Avenue and the FEC Railroad revealed that five of those crossings are metal pipes that have deteriorated to <br />the point that they are also in need of replacement. Staff is of the opinion that the metal pipes and <br />associated stormwater structures should be replaced before the resurfacing of the roadway. <br />Sunshine Land Design, Inc., has provided an estimated cost of $313,783.32 to replace the failing metal <br />stormwater pipes with concrete pipes and to replace associated stormwater structures. The work to be <br />performed will require an additional 65 days of contract time. The estimated cost includes $72,612.38 for <br />contingency line items for the replacement of the existing asbestos water line that crosses the existing <br />stormwater pipe at the five locations identified and for the possible installation of line stops to control the <br />water system during the water line replacement. At this time, it is unknown if the existing water line will <br />need to be replaced or if line stops will need to be installed. <br />FUNDING <br />Funding is available from the following account: <br />Secondary Roads Construction (Reserves) <br />45th Street Beautification <br />Account No. 10921441-066510-03023 <br />($313,783.32) <br />F•\Public Works\ENGINEERING DIVISION PROJECTS \ 1506 -Gifford Neighborhood 45th St Beautification \Admin\agenda items\Change Order 76 <br />#1\Change Order #1 - Pipe Replacement.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.