My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/01/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
12/01/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:43:41 AM
Creation date
2/2/2016 1:46:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/01/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUflSHIfl€ <br />LAND DESIGN <br />3291 SE Uonel Terrace, Stuart, Fl. 34997 <br />Phone: 772 283 2648 / Fax: 772 283 8944 <br />www.SunshineLandDeslgn.com <br />TO: <br />PROPOSAL <br />Richard B. Szpyrka, P.E. PROPOSAL DATE: 10/21/2015 <br />Assistant Public Works Director <br />Indian River County SUBMITTED BY: TIM TAYLOR <br />1801 27th Street Vero Beach, FL 32960 ttavbrnsunshineianddesion.com <br />(772) 226-1221 <br />Email: rszpyrka@Utgov.00m <br />308 DESCRIPTION: <br />.506 - 45th Street Beautification Protect <br />Culvert Replacement Estimate <br />%O8 AS OUTLINED BELOW <br />QU MI6 IIl;t11 ITEM COST <br />102-1 MOBILIZATION 1 LS $ 16,500.00 $ 16,500.00 <br />102-1 MAINTENANCE OF TRAFFIC 1 LS $ 23,100.00 $ 23,100.00 <br />104-1 EROSION AND WATER POLLUTION CONTROL 1 LS $ 5,500.00 $ 5,500.00 <br />108-1 RECORD DRAWINGS/AS-BUILT DRAWINGS 1 LS $ 2,970.00 $ 2,970.00 <br />108-2 SURVEY CONTROL (INSTALL/RE-ESTABLISH) 1 LS $ 1,760.00 $ 1,760.00 <br />110-1-1 CLEARING AND GRUBBING 1 L5 $ 52,162.00 $ 52,162.00 <br />120-6-1 EMBANKMENT 32 CY $ 6.17 $ 197.44 <br />121-1 FLOWABLE FILL NON-0CCAVATABLE 150 CY $ 187.00 $ 28,050.00 <br />280-1 CONCRETE COLLAR 5 EA $ 1,980.00 $ 9,900.00 <br />334-1-13B SUPERPAVE ASPHALTIC CONCRETE 3' SP -12.5 (2 -LIFTS) 410 SY $ 40.81 $ 16,730.30 <br />425-1-521 INLET TYPE 'C 2 EA $ 2,938.65 $ 5,877.30 <br />425-2-551 INLET TYPE 'E' 3 EA $ 3,691.92 $ 11,075.77 <br />430-175-118 ALUMINUM PIPE (18") 56 LF $ 72.74 $ 4,073.61 <br />430-175-124 ALUMINUM PIPE (24") 14 LF $ 83.74 $ 1,172.40 <br />430-175-118A CONCRETE PIPE CULVERT CLASS III (18") 202 LF $ 79.20 $ 15,998.40 <br />430-175-124A CONCRETE PIPE CULVERT CLASS III (24") 72 LF $ 88.00 $ 6,336.00 <br />522-1 CONCRETE FOR SIDEWALK (6' THICK) 45 SY $ 54.60 $ 2,457.00 <br />530-1 SAND CEMENT ENDWALL 10 CY $ 665.50 $ 6,655.00 <br />570-1-2 PERFORMANCE TURF (500) (BAHIA) 200 SY $ 3.56 $ 712.00 <br />1050-15-004 UTILITY PIPE, REPAIR INSTALL (SEWER IF NECESSARY) 2 EA $ 2,750.00 $ 5,500.00 <br />DISPOSE AND REPLACE AC WITH C-900 (40' SECTIONS) ROMAC CPLD 5 EA $ 4,888.75 $ 24,443.73 <br />CONTINGENT SAMPLE POINT AND BACTERIOLOGICAL ItSIPIG 5 EA $ 622.88 $ 3,114.38 <br />CONTINGENT SINGLE LINE STOP 10 EA $ 4,664.00 $ 46,640.00 <br />CONTINGENT VALVE ASSEMBLY, ROMAC COUPUNGS, BOX 10 EA $ 2,285.80 $ 22,858.00 <br />65 DAY EXTENSION <br />PER CHANGE ORDER <br />QUALIFICATIONS: <br />'TOTAL: $ 313,783.32I <br />THIS PROPOSAL MAY BE SUBJECT TO CHANGE IF NOT ACCEPTED WITHIN THIRTY DAYS. <br />PAYMENTS NOT MADE PER THE ABOVE, SHALL BE SUBJECT TO ALL TERMS OF THE FLORIDA UEN LAW. THIS INCLUDES ADDITIONAL INTEREST AND REASONABLE <br />LEGAL FEES. <br />ACCEPTANCE SIGNATURE DATE <br />SUNSHINE LAND DESIGN INC' DATE <br />COC151SU5/CUC1223792 <br />Cross Drain Repbcsment Revised CAP 11/8/2015 <br />79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.