My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/16/1986
CBCC
>
Meetings
>
1980's
>
1986
>
4/16/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:01 AM
Creation date
6/12/2015 12:21:22 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/16/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
week will put out only 432,000 gpd, or a difference of <br />approximately 150,000 gallons per day. <br />The Chairman asked if that gallonage meets specifications, <br />and Mr. Sheldon stated that they did not have specific require- <br />ments as to gallonage or inches. He emphasized that they have a <br />particular concern for the site because it is the sandiest site <br />they have ever worked on; the percolation rate is tremendous; and <br />they are concerned about putting $70,000 of grass on the site and <br />making sure it lives. <br />Chairman Scurlock believed they surveyed the site before <br />they took the job and asked why they designed the specs at 1111 <br />and 2" if they thought the sandy soil would require more. Mr. <br />Sheldon clarified that they do not think it will require more <br />than that; the problem is that the Rain Bird plan does not <br />provide 2" on the greens. <br />The Chairman stated that it then apparently doesn't meet the <br />specs in any event and there is no need to even to consider this <br />any further. Mr. Sheldon explained that there were specifica- <br />tions, but they did not provide a number for certain inches or <br />quantities. Those numbers are just an accepted industry <br />standard. <br />Chairman Scurlock noted that the architect apparently did <br />not prepare any specifications, but just told the suppliers to go <br />design a system and present it. He continued that as he sees it, <br />there is a $24,423 expense difference with the Toro system being <br />more expensive. In addition to that, he wished to know if the <br />Toro system requires an additional pump to go to an additional 9 <br />holes. <br />Mr. Sheldon advised that the Toro will require one pump to <br />be set in the pump station for a third nine holes; the Rain Bird <br />does not require that. <br />Lengthy discussion ensued with the Chairman adding up the <br />difference in costs between the two systems, starting with the <br />$24,000 difference plus $10,000 for the additional pump, and then <br />62 BOOK 64 wl),F.209 <br />APR 16 1986 <br />
The URL can be used to link to this page
Your browser does not support the video tag.