My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/08/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
12/08/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:29:45 AM
Creation date
2/4/2016 10:05:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/08/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverable B: One electronic copy of the 2015 Post -Construction Physical Monitoring Report. <br />(CBI WO 9 — Tasks 1 through 6). <br />Total Cost: $35,057 (DEPARTMENT Cost: $17,528.50). <br />Due Date: January 31, 2018. <br />Deliverable C: 2015 Rectified Aerials as required by DEPARTMENT Joint Coastal Permit 0285993, modification <br />0285993 -008 -JN, Special Permit Conditions 53 and 56(c). (CBI WO No. 9). <br />Total Cost: $15,805 (DEPARTMENT Cost: $7,902.50) <br />Due Date: January 31, 2018. <br />NOTE: The deliverable due dates established in this Grant Work Plan indicate the time by which a <br />deliverable is received and approved for cost sharing. The dates do not necessarily correspond with permit <br />required due dates. The Local Sponsor must meet the terms of the permit for compliance. <br />All Tasks are Contractual Services. <br />DEP Agreement No. 14182, Amendment No. 2, Attachment A, Page 6 of 6 <br />109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.