Laserfiche WebLink
paved road with between 70 feet and 100 feet of existing public road right-of-way (variable width) <br />and is classified as an Urban Collector on the future roadway thoroughfare plan map. 9th Street <br />SW (Oslo Road) is a four lane road with center turn lane and is classified as an Urban Principal <br />Arterial on the future roadway thoroughfare plan map with between 75 and 100 feet of right-of- <br />way (variable width). According to the county's comprehensive plan, this segment of Old Dixie <br />Highway SW needs a total of 100 feet of ROW for future roadway needs and this section of Oslo <br />Road needs a total of 130 feet of ROW for future roadway needs. <br />Zoning District Differences <br />In terms of permitted uses, there are both similarities and differences between the existing CH <br />district and the proposed CG district (see Attachment 3). Their respective zoning districts' purpose <br />statements best illustrate the differences between the zoning districts. These purpose statements, <br />found in the County's Land Development Regulations (LDRs), are as follows: <br />CH: Heavy Commercial District. The CH, heavy commercial, district is intended to provide areas <br />for establishments engaging in wholesale trade, major repair services and restricted light <br />manufacturing activities. The CH district is further intended to provide support services necessary <br />for the development of commercial and industrial uses allowed within other nonresidential zoning <br />districts. <br />CG: General Commercial District. The CG, general commercial district, is intended to provide <br />areas for the development of general retail sales and selected service activities. The CG district is <br />not intended to provide for heavy commercial activities, such as commercial service uses, heavy <br />repair services nor industrial uses. <br />One principal difference between the CH and CG districts that is particularly applicable in this <br />case is that the CH district does not permit grocery stores, variety stores, or the sale of <br />miscellaneous shopping goods, while the CG district allows those uses. <br />ANALYSIS <br />In this section, an analysis of the reasonableness of the rezoning request will be presented. <br />Specifically, this section will include an analysis of the request's: <br />• Impact on public facilities; <br />• Consistency with the county's comprehensive plan; <br />• Compatibility with the surrounding area; and <br />• Potential impact on environmental quality. <br />Impact on Public Facilities <br />The subject property is located within the Urban Service Area, an area deemed suited for urban <br />scale development. Within the Urban Service Area, the comprehensive plan establishes standards <br />for: Transportation, Potable Water, Wastewater, Solid Waste, Stormwater Management, and <br />Recreation (Future Land Use Policy 3.1). The adequate provision of those services is necessary <br />4 <br />136 <br />