My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/08/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
12/08/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:29:45 AM
Creation date
2/4/2016 10:05:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/08/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />c2) <br />TO: <br />THROUGH: <br />FROM: <br />SUBJECT: <br />DATE: <br />Joseph A. Baird, <br />County Administrator <br />c <br />Christopher R. Mora, P.E. <br />Public Works Director <br />James D. Gray, Jr. <br />Coastal Engineer <br />CONSENT AGENDA <br />Amendment No. 2 - FDEP Grant Agreement No. 141R2 <br />Sector 3 Dune Repair Project <br />November 30, 2015 <br />DESCRIPTION AND CONDITIONS <br />The Florida Department of Environmental Protection (FDEP) received FY 2013/2014 funding to <br />assist in the recovery of the State's beaches following Hurricane Sandy and Tropical Storm Debby. <br />On November 22, 2013, FDEP entered into grant Agreement No. 14IR2 with Indian River County, <br />was revised by change order on September 3, 2014, and amended October 20, 2014. <br />The grant agreement commits state funds for design, permitting, and construction phase services <br />required for the repair of the Sector 3 Beach and Dune Restoration Project constructed between <br />2010 and 2012. The agreement commits up to $5,400,000 at a cost share ratio of 50% State - <br />50% Local. The total local share under this agreement is $2,700,000. <br />The Sector 3 Dune Repair Project was completed on March 24, 2015. Currently, the County is <br />conducting permit required post construction monitoring. <br />Amendment No. 2 to FDEP grant Agreement No. 14IR2 effectuates the following: <br />• Extends the grant period to April 30, 2018, <br />• Amends grant Task 3.3 Hurricane Repair Construction by adding specific construction <br />related Deliverables that were not previously identified in Task 3.3 of the original <br />agreement, and <br />• Adds grant Task 4.1 2015 Biological Monitoring and Task 4.2 2015 Physical Monitoring. <br />Amendment No. 2 does not change the total FDEP grant funding available for this project or the <br />State cost share percentage of 50%. <br />F \Public Works\JamesG\141R2 FDEP Grant\Amendment No. 2\agenda item 141R2 FDEP Grant Agreement -- amendment no. 2.docx <br />90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.