Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual cove ants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or `'Eomated in the Contract <br />Documents. The Work is generally described as follows: <br />The proposed improvements to thel`St'ieet S. nd 43nd Avenue intersection will <br />consist of the reconstruction of a portion of tree1 /. Willitbe addition ofNeft turn lanes in <br />the east and west bound direction. 43renue Abe milandles rfaced within the <br />intersection. Approximately 2,170 feettof 48"11046" reintificed conc'retelrtie will be installed in <br />the Indian River Farms Water Control D'strict Can it ._Rework will also include: a traffic signal, <br />four foot wide paved shoulders, curbi q;.. Barad. a five fa l wide sidewalk along the north side of <br />the right-of-way, signing, and Davement ar` gs. <br />ARTICLE 2 - THE PROJE, <br />2.01 The Project for which the <br />part is ge all describe <br />Contras Documents may be the whole or only a <br />Project ; a` " `: st Stree SSW. and 43rd Avenue Intersection Improvements <br />County ojec ber: 2i <br />Bid Nu c: r: 20.0 <br />ProjectAo ores' s 1St Sheet S.W. at 43rd Avenue, Vero Beach, FL <br />3.01 The Indian River,Gounty Public Works Department is hereinafter called the ENGINEER <br />and will act .__ _a • NER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />00520 - Agreement (Public Works) REV 06-14 - SAMPLE <br />00520 - 2 <br />F:1Public Works\ENGINEERING DIVISION PROJECTS\1232-1st St SW 43rd Ave Intersec Improv\Admim\agenda items \00520 - Agreement (Public Works) REV 06-14 - <br />SAMPLE.doc <br />94 <br />