Laserfiche WebLink
Exhibit #1 (Scope of Work) WO # 2 <br />12/4/2015 Gravity Sewer Design For Study Area 2 <br />Page 2 File #1422LE <br />• The area of Roseland between Roseland Road and the Saint Sebastian River from <br />Kelso Place to 128`h Court. <br />The project will increase flows into two (2) of the existing County Utilities' pump stations along <br />Indian River Drive. Our services will include evaluation of these pump stations and, if <br />necessary, design of required modifications. In addition, our services will include design of an <br />interconnection of the Indian River Drive force main and the railroad force main in the vicinity of <br />Truman Street. This will improve the Indian River Drive force main system performance <br />The estimated number of existing and future Equivalent Residential Units (ERUs) which can be <br />connected to this proposed project is 332 and 58, respectively. <br />The estimated total construction cost of this project is $2,750,000.00. <br />A specific list of tasks and their brief description is presented as follows: <br />Task A — Civil Engineering Services <br />Masteller & Moler, Inc. will provide final design, prepare construction plans and permit <br />applications for the project as described in the "Scope of Services" section of this proposal. <br />Task B — Surveying Services <br />The approximate length of the right-of-way limits is 21,100 linear feet (3.98 miles). <br />Masteller, Moler & Taylor, Inc. will perform surveying services for the project as follows: <br />1) Project initiation, including review of existing deeds and surveys, files and field notes, <br />preparation of work orders and field crew folders <br />2) Find, recover and measure field ties into existing survey control along the route to <br />establish the rights of way and baseline of survey. Tie Horizontal Control to Florida <br />State Plane Coordinate System, Florida East Zone, NAD '83. <br />3) Find and recover existing vertical control. Elevations shall be based upon the North <br />American Vertical Datum of 1988 (NAVD '88) with a conversion to the National <br />Geodetic Vertical Datum of 1929 (NGVD '29) provided. Perform bench run and <br />establish benchmarks along the survey corridor at maximum 1,000 foot intervals. <br />4) Field monument baseline control at maximum 1,000 foot intervals. Control points shall <br />consist of iron rod and cap or nail and disk. Control points shall be designated on <br />survey with station/offset and NAVD '88 elevation. <br />5) Field locate and record vertical ground elevations sufficient to generate a center line of <br />road profile for the main corridor and side streets and all distinct locations (inverts, <br />retention areas, swales, ditches etc.) and changes in contour along the right of way <br />corridor. Obtain ground elevation on each property in center of lot if vacant or near <br />existing septic location to the best of our abilities. If septic location not obtainable, <br />obtain ground elevation near existing main building. <br />6) Field locate and record existing improvements and man-made features within the right <br />of way, including but not limited to, roads, swales, driveways, culverts, signage and <br />mailboxes, visible utilities, fences etc. within the existing right-of-way. <br />125 <br />