Laserfiche WebLink
CARTER ASSOCIATES, fl ES, II C. <br />CONSULTING ENGINEERS AND LAND SURVEYORS <br />1708 2Ist STREET • VERO BEACH, FLORIDA 32960-3472 • 772.562-4191 • 772-562-7180 (FAX) <br />JOHN H. BLUM, P.E., PRINCIPAL <br />DAVID E. LUETHJE, P.S.M.. PRINCIPAL <br />GEORGE A. SIMONS. P.E. PRINCIPAL <br />PATRICK S. WALTHER. P.E. PRINCIPAL <br />MARVIN E. CARTER. P.S.M.. Consultant to the Firm <br />DEAN F LUETHJE. P.E.. Consultant to the Finn <br />November 17th, 2015 <br />Mr. Aljuna Weragoda , Capital Projects Manager <br />Indian River County Dept. of Utility Services <br />1801 27th Street, Bldg. A <br />Vero Beach, Florida 32960 <br />RE: Indian River County Dept. of UtilityServices <br />Wabasso Bridges Hanging Reuse Water Main:Crossings <br />Inspection, Surveying and Reporting -Service's Proposal <br />CAI Project No. 15-54 E <br />Dear Mr. Weragoda: <br />FRANK S. CUCCURESE, P.S.M. <br />CLINTON J. RAHJES, P.E. <br />STEVE D. SNOBERGER. P.E. <br />It is Carter Associates, Inc.' s (CAI) pleasure to present for your acceptance,, the following revised <br />Proposal for professional engineering and surveying services associated with the above mentioned <br />project. The Wabasso Bridge Reuse Main crossings consist of double 12 -inch -diameter ductile iron <br />mains hanging under the bridge decks. There are 4 bridge crossings_ consisting of 3 low elevation <br />structures and a high causeway structure. Together,. the total length of. exposed pipe is <br />approximately 3,400 linear feet. Since installation, the metal pipes have:expetienced several small <br />failures, but have had no complete inspection for the weathering process caused" by the salty <br />environment. A quick visual view of the hanging pipes indicates the need for -such: an examination <br />based on the pictures we observed with you. <br />With the pipes being hung under each of the bridge decks, access is limited to -a mobile platform <br />deck. Rather than using a multi -boom lift crane, which would require _ drive lane' closure for a <br />significant time, CAI has experience, on this very bridge, using a rolling scaffold. for pipeline <br />inspection. During 2001-2003, CAI conducted: inspection; design; bidding; and inspection and <br />subsequent re -coating services for the 16 -inch diameter cast iron pipe currently hanging under the <br />south side of the Wabasso Bridge decks. Unfortunately, the inspection scaffold -for that project no <br />longer exists. CAI would propose the same successful inspection techniques used on the south side <br />to inspect the County's Reuse Mains located under the north side bridge decks. Please find attached <br />our Engineering and Surveying scope of services and budget outlining the steps required to prepare <br />for the inspection, conduct the: field inspection; data review; engineering analysis; and reporting. <br />Our total price for the services as outlined and estimated Reimbursable Expenses shall not exceed <br />$56,048.42. These services would be furnished under our existing Engineering Contract with the <br />County, dated November 4th, 2014. Invoices would be billed only for actual hours and costs as <br />identified hereafter. <br />Page 1 of 14 <br />N:\SDS\15-54 E (IRCUD Wabasso Causeway)\Proposal\Rev. Proposal.doc <br />'j Serving Florida <br />Sine 1911 <br />135 <br />