My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/15/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
12/15/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 9:21:20 AM
Creation date
2/4/2016 11:27:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/15/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Report Drafting and Preparation <br />a) Engineer I (Registered) <br />b) Secretary/Word Processor <br />H. Reimbursable Expenses <br />1. Reproduction <br />a) B/W Xerox (sizes vary) <br />b) Report Covers & Binder <br />c) Digital Color Picture Prints (8.5" x 11") <br />2. Postage and Express Mail <br />3. Photo Expenses <br />20 $ 140.00 $ 2,800.00 <br />10 $ 45.00 $ 450.00 <br />240 $ 0.25 $ 60.00 <br />5 $ 6.50 $ 32.50 <br />350 $ 1.00/ea. $ 350.00 <br />N/A At Cost $ 120.00 <br />N/A At Cost $ 250.00 <br />Total = $56,048.42 <br />Note: * = Rain delays are not included in the time frame during which the Work is to be provided. <br />Without rain delays, we anticipate completion of the scaffold manufacturing, inspection services, <br />engineering, and report production is estimated to require 9 to 11 calendar weeks, including <br />weekends and holidays. <br />Page 5 of 14 <br />N:\SDS\15-54 E (IRCUD Wabasso Causeway)\Proposal\Rev. Proposal.doc <br />_IpkiServingFlorida <br />Since 1911 <br />139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.