My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/12/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
01/12/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2016 12:02:00 PM
Creation date
2/4/2016 12:00:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/12/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit#la(Scope of Work) WO# 2 <br /> 12/29/2015 Gravity Sewer Design For Study Area 2 <br /> Page 2 File #1422LE <br /> • The area of Roseland between Roseland Road and the Saint Sebastian River from <br /> Kelso Place to 128th Court <br /> The project will increase flows into two (2) of the existing County Utilities' pump stations along <br /> Indian River Drive Our services will include evaluation of these pump stations and, if <br /> necessary, design of required modifications. In addition, our services will include design of an <br /> interconnection of the Indian River Drive force main and the railroad force main in the vicinity of <br /> Truman Street. This will improve the Indian River Drive force main system performance. <br /> The estimated number of existing and future Equivalent Residential Units (ERUs) which can be <br /> connected to this proposed project is 332 and 58, respectively. <br /> The estimated total construction cost of this project is $1,990,000.00. <br /> A specific list of tasks and their brief description is presented as follows: <br /> Task A— Civil Engineering Services <br /> Masteller & Moler, Inc. will provide final design, prepare construction plans and permit <br /> applications for the project as described in the "Scope of Services" section of this proposal. <br /> Task B—Surveying Services <br /> The approximate length of the right-of-way limits is 21,100 linear feet (3.98 miles). <br /> Masteller, Moler & Taylor, Inc will perform surveying services for the project as follows <br /> 1) Project initiation, including review of existing deeds and surveys, files and field notes, <br /> preparation of work orders and field crew folders. <br /> 2) Find, recover and measure field ties into existing survey control along the route to <br /> establish the rights of way and baseline of survey. Tie Horizontal Control to Florida <br /> State Plane Coordinate System, Florida East Zone, NAD '83. <br /> 3) Find and recover existing vertical control. Elevations shall be based upon the North <br /> American Vertical Datum of 1988 (NAVD '88) with a conversion to the National <br /> Geodetic Vertical Datum of 1929 (NGVD '29) provided. Perform bench run and <br /> establish benchmarks along the survey corridor at maximum 1,000 foot intervals. <br /> 4) Field monument baseline control at maximum 1,000 foot intervals. Control points shall <br /> consist of iron rod and cap or nail and disk. Control points shall be designated on <br /> surrey with station/offset and NAVD '88 elevation. <br /> 5) Field locate and record vertical ground elevations sufficient to generate a center line of <br /> road profile for the main corridor and side streets and all distinct locations (inverts, <br /> retention areas, swales, ditches etc.) and changes in contour along the right of way <br /> corridor. Obtain ground elevation on each property in center of lot if vacant or near <br /> existing septic location to the best of our abilities. If septic location not obtainable, <br /> obtain ground elevation near existing main building. <br /> 6) Field locate and record existing improvements and man-made features within the right <br /> of way, including but not limited to, roads, swales, driveways, culverts, signage and <br /> mailboxes, visible utilities, fences etc. within the existing right-of-way <br /> 199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.