My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/12/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
01/12/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2016 12:02:00 PM
Creation date
2/4/2016 12:00:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/12/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 29, 2015 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> "EXHIBIT 1c" <br /> WORK ORDER NO.2 <br /> (Time Schedule) <br /> Time of Performance <br /> The estimated time frame for completion of services from the approval of this Work Order <br /> is as follows: <br /> MILESTONE COMPLETION DATE <br /> Tasks A, B, and C 240 Calendar Days after Notice To Proceed <br /> Note: <br /> The time for completion of the 60% design drawings, permit applications and Engineer's <br /> Opinion of Probable Construction Cost for the project shall be four (4) months from notice <br /> to proceed. Once permits are received, 100% design drawings shall be completed in thirty <br /> (30) calendar days thereafter. <br /> 202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.