My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/14/1986
CBCC
>
Meetings
>
1980's
>
1986
>
5/14/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:01 AM
Creation date
6/12/2015 12:25:27 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/14/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Lyons, SECONDED by <br />Commissioner Wodtke, the Board unanimously <br />directed staff to work with the Forestry Division <br />to establish a few fire breaks in the area rather <br />than the complete.clearing requested by the residents <br />of Vero Lakes Estates. <br />WABASSO CAUSEWAY MALNTENANCE DREDGING AND EROSION <br />The Board reviewed the following memo dated 4/14/86: <br />TO: DATE: 'FILE: <br />�-,,, -.'• April 14, 1986 <br />` �O Ecinmis loner Pat Lyons, V. Chairman <br />ea"" -""UT msmissioner Dick Bird, Chairman of <br />1 Paris & Recreation Commission Fi ="Ce <br />aL � .�••a•J SUBJECT:. <br />Wabasso Causeway Maintenance <br />THROUGH: Michae ght, County Admn. Dredging and Erosion <br />Q <br />FROM: James W. Davis, P.E. '� ' PEFERENgg§: SOS: 1) Commissioner Patrick <br />Public Works Director Lyons o c el Wright dated 3/24/86 2) Commis- <br />sioner Pat Lyons to Art Challacombe dated 3/24/86. <br />In response to your 3/24/86 memo and to inquiry voiced at the 4/10/86 Recreation <br />Committee meeting, I have researched the feasibility of maintenance dredging beneath <br />the Wabasso low level- bridges spanning the Indian River. The following permit <br />information and alternatives are offered: - <br />• N• M1 <br />On 4/11/86, I spoke with Mr. Marc Ady, Envirormlental Specialist of the Florida <br />D. E. R: in Orlando (phone suncom. 393-1011) . I explained- the fact that the existing <br />bridges were constructed from September, 1968, to June, 1970, and that the original <br />design specified a 150' wide channel beneath the west bridge to a depth of -6.5' MSL. °- <br />The channels have repeatedly silted in, and in 1978, the County received a D.E.R. <br />Permit #31-11410-4E and a C.O.E. Permit #78J--1333 to excavate only 950 C. Y. of <br />material below the MHW to restore minimal flow beneath the bridge. This work was <br />done by clam shell and the spoil trucked to upland sites, all by County equipment. <br />In response, Mr. Ady informed me that: <br />1) If the original bridge work and dredging was performed prior to April 3, <br />1970, the County could be exempt from a General Permit, which may involve an Environ - <br />rental Impact Statement. This exemption depends on the original D.O.T. dredging <br />specifications prior to April 1970, and if the proposed maintenance dredging does not <br />go deeper than 5 feet below mean low water. Mr. Ady recommended that we prepare a <br />permit application including the following: <br />1) Plan view, profile and cross-section drawings of the proposed project <br />indicating 14LW elevations, MHW elevations, proposed and existing <br />hydrography and other pertinent features. <br />2) The D.O.T. specs for the original. dredging. <br />3) Date the original dredging was complete. <br />If we are not exempt, we may have to prepare an Environmental Impact Statement. <br />MAY 14, 1986 <br />37 <br />BOOK 64 pm, 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.