Laserfiche WebLink
i <br /> Table 5 <br /> FEBRUARY 2016 BUDGET ESTIMATE <br /> SOUTH GIFFORD ROAD LANDFILL <br /> PHASE 5: Semi-Annual Sampling Activities <br /> ITEM BASIS RATE QUANTITY ESTIN9ATED <br /> BUDGET <br /> A. Professional Services <br /> Senior Project Geologist hr $184 4 $736 <br /> Geologist hr $132 16 $2,112 <br /> Senior Staff Geologist hr $116 116 $13,456 <br /> Subtotal Professional Services 516,304 <br /> B. Technical/Administrative Services <br /> Field Superintendent hr $116 116 $13,456 <br /> Administrative Assistant hr $92 2 $184 <br /> Subtotal Technical/Administrative Services 513,640 <br /> C. Subcontractors <br /> Laboratory Analysis for VOCs each $73 83 $6.039 <br /> Laboratory Analysis for TOC each $27 4 $107 <br /> Laboratory Analysis for Dissolved Gases each $64 6 $385 <br /> Laboratory Analysis for Dhc each $305 1 2 $610 <br /> Laboratory Analvsis for verA each 1 $144 1 2 $289 <br /> Subtotal Subcontractor Services 57,430 <br /> D. Reimbursables <br /> PDBs for Summer event quote $32 39 $1,249 <br /> PDBs for Winter event quote $32 25 $801 <br /> Drums each $50 2 $100 <br /> Drum Transport each $963 2 $1,926 <br /> Lodging day $169 18 $3,042 <br /> Per Diem day $59 18 $1.062 <br /> Communications Fee 3%labor 0.03 $29,944 $898 <br /> Field Vehicle day $97 18 $1,746 <br /> 8.5"x 1 I"Photocopies each $0 12 160 $19 <br /> Overnight Cooler each $95 4 $380 <br /> Groundwater Sampling Kit(per sampler) day $300 9 $2,700 <br /> Water Level Measurement Kit(2 person team) day $55 2 $110 <br /> PDB Deployment Kit day $100 2 $200 <br /> Equipment Shipping each $54 3 $162 <br /> Subtotal Reimbursables 514,396 <br /> TOTAL ESTIMATED BUDGET: PHASE 5 551,770 <br /> Notes: <br /> 1 Lodging and per diem rates were taken from the GSA website for the Vero Beach area(www.gsa.gov). <br /> 2. Groundwater Sampling Kit includes two sets of the following:water level indicator peristaltic pump,water quality meter(pH, <br /> temperature,conductivity,dissolved oxygen,and oxidation reduction potential),turbidity meter, tubing,and miscellaneous field supplie: <br /> 3 Water Level Measurement Kit includes:water level indicator and miscellaneous field supplies. <br /> 4.PDB Deployment Kit includes:miscellaneous field supplies necessary to suspend and deploy PDBs. <br /> XR16001 xlsx Geosyntec Consultants <br />