Laserfiche WebLink
SCHEDULE OF BID ITEMS -A <br />Indian River Drive- Scenario No.3 <br />BID NUMBER 2015029 <br />FINAL PROJECT COST <br />Date: <br />February 20, 2016 <br />IIInstalled <br />Cost <br />Bid <br />Bid Item <br />Estimated <br />Unit of <br />Unit <br />Total <br />Item No. <br />(Description I <br />Quantity I <br />Measure I <br />Price I <br />Price <br />1 <br />Install 8" PVC Water Main <br />14 <br />LF <br />33.10 <br />$463.40 <br />Install 8" HDPE Directional Bore Including Fusion of <br />2 <br />647 <br />LF <br />33.10 <br />$21,415.70 <br />MJ Adaptors and Pipe <br />3 <br />Driveway Bores <br />0 <br />LF <br />33.10 <br />$0.00 <br />4 <br />Install 8" NRS Resilient Seated Gate Valve and Box <br />1 <br />EA <br />1,600.00 <br />$1,600.00 <br />5 <br />Install Water Service - Single Short w/Yoke & Box <br />4 <br />EA <br />925.00 <br />$3,700.00 <br />6 <br />3 <br />EA <br />1,800.00 <br />$5,400.00 <br />Install Water Service -Double Short w/Yoke &Box <br />7 <br />Install Water Service - Single Long w/Yoke & Box <br />1 <br />EA <br />925.00 <br />$925.00 <br />8 <br />Install Water Service - Double Long w/Yoke & Box <br />2 <br />EA <br />1,800.00 <br />$3,600.00 <br />Subtotal Water System <br />$37,104.10 <br />9 <br />Install 8" HDPE Directional Bore Including Fusion of <br />1,040 <br />LF <br />$33.10 <br />$34,424.00 <br />MJ Adaptors and Pipe <br />10 <br />Install Water Service - Single Short w/Yoke & Box <br />1 <br />EA <br />$925.00 <br />$925.00 <br />11 <br />Install Water Service - Double Short w/Yoke & Box <br />1 <br />EA <br />$1,800.00 <br />$1,800.00 <br />12 <br />Install Water Service - Single Long w/Yoke & Box <br />3 <br />EA <br />$925.00 <br />$2,775.00 <br />Install New Fire Hydrant Assembly with 6" Gate Valve <br />1 <br />EA <br />$4,000.00 <br />$4,000.00 <br />13 <br />and Box <br />Subtotal Water System <br />$43,924.00 <br />14 <br />Public Construction Bond <br />1 <br />LS <br />$2,882.76 <br />$2,882.76 <br />15 <br />Mobilization, Demobilization, MOT <br />1.00 <br />I LS <br />$4,804.60 <br />$4,804.60 <br />16 <br />Contingency (Relocate 5 existing water services) <br />I 1.00 <br />LS <br />3,500.00 <br />$3,500.00 <br />Ij <br />Subtotal <br />Mob., Demob., & MOT <br />$92,215.46 <br />Engineering & Administration <br />1.00 <br />LS <br />$4,000.00 <br />$4,000.00 <br />Surveying <br />1.00 <br />LS <br />$19,250.00 <br />$19,250.00 <br />Geotechnical Testing <br />1.00 <br />LS <br />$1,985.00 <br />$1,985.00 <br />Bidding & Award <br />1.00 <br />LS <br />$1,648.50 <br />$1,648.50 <br />Permitting <br />1.00 <br />LS <br />$650.00 <br />$650.00 <br />Construction Services <br />1.00 <br />LS <br />$1,000.00 <br />$1,000.00 <br />TOTAL $120,748.96 <br />ATTACHMENT NO. 2 <br />