My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/09/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
02/09/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:55:05 AM
Creation date
3/4/2016 12:33:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/09/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: January 28, 2016 <br />To: Joseph A. Baird, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services <br />Prepared By: Arjuna Weragoda, P.E., Capital Projects Manager Aw <br />Subject: 45th Street Watermain Replacement- Change Order No.3. <br />DESCRIPTIONS AND CONDITIONS: <br />On July 7, 2015 the Board of County Commissioners (BCC) approved the award of Bid No. 2015040 in <br />the amount of $1,306,877.14 to Sunshine Land Design, Inc., for the 451h Street Beautification Project. <br />On December 1, 2015 the BCC approved Change Order No.1 and -2 for a total sum of $580,085.24. <br />The subject project is administered by Public Works. Change Order No.1 is to replace five (5) failing <br />culverts crossing 45th Street at various locations for an amount of $313,783.32 and Change Order No.2 <br />was to replace the existing AC watermain for a lump sum amount of $266,301.92. <br />ANALYSIS: <br />The scope of work performed under Change Order No.2 did not include approximately 500 -LF of AC <br />pipe to the west of the termination. Given the age of the infrastructure, material type and that the <br />existing main will be under the new pavement, it is pragmatic for the Department of Utility Services to <br />have the existing AC main replaced with the current project. Furthermore, it is reasonable to have the <br />new main (PVC/HDPE ) installed away from the new roadway and landscape at this time with the same <br />Contractor and minimize further interruption of service to our customers in this area. This addition will <br />replace all of the existing AC watermain from 32nd Avenue west along 45th Street. There still remains <br />approximately 1500 -LF of AC main to the east that will need to be replaced at a later date. Also, part of <br />the subject change order is to correct a deficiency at 29th Ct and 451h Street. Staff from the Department <br />of Utility Services met with the Contractor performing the 45th Street beautification improvements and <br />discussed our intentions and requested a price proposal. Sunshine Land Design, submitted a price <br />proposal on January 27, 2016 for a lump sum amount of $46,387.63 to perform the above described <br />work. The additional work may add fifteen (15) additional days to the contract. The contractor has <br />stated that the additional work will not delay the culvert replacements but may delay the placement of <br />the final lift of asphalt on the westbound lane. <br />FUNDING: <br />Funding for the 45th Street Watermain Replacement project is available in the Capital account in the <br />Operating Fund. The Operating fund budget is derived from water and sewer revenues. <br />66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.