My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/09/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
02/09/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:55:05 AM
Creation date
3/4/2016 12:33:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/09/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00942 - Change Order Form <br />No 3 <br />DATE OF ISSUANCE- February 9. 2016 EFFECTIVE DATE- February 9, 2016 <br />OWNER: Indian River County <br />CONTRACTOR Sunshine Land Design, Inc. <br />Project: Gifford Neighborhood 45th Street Beautification Project <br />OWNER's Project No. 1506 <br />OWNER'S Bid No. 2015040 <br />You are directed to make the following changes in the Contract Documents: <br />Description: <br />Replace existing asbestos concrete (ACJ watermoin along 45th Street from west terminus to 401h <br />Avenue. <br />Reason for Change Order: <br />Given that the asbestos concrete (ACJ main installed in 1968 will be under the new pavement and in <br />conflict with the proposed landscape, it is pragmatic to have the existing AC main replaced with <br />PVC/HDPE away from the new roadway and landscape at this time and minimize further interruption of <br />service to our customers in this area. <br />Attachments: (List documents supporting change) <br />Sunshine Land Design, Inc., Proposal for IRC 45th Street AC Water main Replacement Repair near 29`h <br />Ct and West Extension <br />CHANGE IN CONTRACT <br />PRICE: <br />Time <br />Description <br />Amount <br />Original Contract Price <br />$1,306,877.14 <br />Net Increase (Decrease) <br />$580.085.24 <br />from previous Change <br />Orders No. 1 &2: <br />(days) <br />Contract Price prior to this <br />$1.886.962.38 <br />Change Order- <br />rderNet <br />110 <br />Netincrease (decrease) of <br />$46.387.63 <br />this Change Order: <br />(days or dates) <br />Contract Price with all <br />$1.933.350.01 <br />approved Change Orders: <br />260 <br />AC PTED: <br />By: ;�--h <br />'j� <br />CONTRACTOR (Signature) <br />Date: <br />CHANGE IN CONTRACT TIMES <br />Description <br />Time <br />Original Contract Time: <br />(days or dates) <br />Substantial Completion <br />120 <br />Final Com letion: <br />150 <br />Net change from previous Change <br />Orders No .1&2: <br />(days) <br />Substantial Completion: <br />110 <br />Final Completion: <br />110 <br />Contract Time prior to this Change <br />Order: <br />(days or dates) <br />Substantial Completion: <br />230 <br />Final Completion. <br />260 <br />Net increase (decrease) this <br />Change Order- <br />(days or dates) <br />Substantial Completion: <br />15 <br />Final Completion: <br />15 <br />Contract Time with all approved <br />Change Orders: <br />(days or dates) <br />Substantial Completion: <br />245 <br />Final Com letion• <br />275 <br />REC M DED <br />By: <br />ENGINE (Signa e <br />Date: <br />APPROVED: <br />By: <br />OWNER (Signature) <br />Date: <br />00942 - Change Order No.ldocx <br />00942-1 <br />FAUtUJ iesllnlLRY - EntyneemylProjeM - Utility Construction Pemtit$URC - 45th Streel AC WM Replacement 33rd Av. to 40th Av%AOminW0942 - Change Oroef N0.3,dom <br />Rev 05101 <br />68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.