My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/28/1986
CBCC
>
Meetings
>
1980's
>
1986
>
5/28/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:02 AM
Creation date
6/12/2015 12:27:55 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/28/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 2 8 1996 <br />BOOK 04 ROL) 550 <br />Valenza, Assistant Vice President of Construction for Murray <br />Enterprises, had planned on being here this morning, but has not <br />arrived as yet. <br />ON MOTION by Commissioner Lyons, SECONDED by <br />Commissioner Bowman, the Board unanimously tabled <br />this item until later in the meeting or until the <br />arrival of Mr. Valenza. <br />D. Bid Acceptance _ Old Dixie and 8th Street Road Improvements <br />The Board reviewed the following memo dated 5/20/86: <br />TO: THE HONORABLE BOARD OF DATE: May 20, 1986 FILE: <br />COUNTY COrM'iISSIONERS <br />THROUGH: MIC11AEL, WRIGIIT <br />COUNTY ADMINISTRATOR <br />JAMES W. DAVIS, P.E.SUP "IT: <br />PUBLIC WORKS DIRECTO, <br />Bid Acceptance Old Dixie <br />and 8th Street <br />FROM:Ralph N. Brescia, P.E. REFERENCES: <br />County Engineer <br />BACKGROUND INFORMATION <br />As a result of an intersection study of Old Dixie Highway and 8th <br />Street approved by the Transportation Committee in March of 1983, the <br />following recommendations were made: <br />1. The installation of a traffic signal. <br />2. Provision of left turns for all approaches. <br />It is noted that the traffic signal was installed in August of 1984. <br />In order to properly implement Left turns at all approaches, an Engineering <br />Design and appropriate plans and specifications for roadway widening were <br />prepared by the Public Works Engineering Department. These plans were made <br />available to all interested contractors in response to our advertisement <br />for bids placed in the Press Journal during the week of April 28th. <br />DESCRIPTION AND CONDITIONS <br />A prebid meeting was held with all interested contractors and the <br />Engineering Staff on May 7, 1986, to answer any specific questions on the <br />plans and specifications. <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.