My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-037
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 1:25:21 PM
Creation date
3/16/2016 11:56:43 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Projected Scope and Budget Attachment A <br /> Materials Testing Services <br /> Old Dixie Highway Resurfacing Project <br /> Indian River County,Florida <br /> Project Name: Old Dixie Hwy Resurfacing IRC Project#11378 Dunkelberger Engineering&Testing, Inc.,A Terracon Company <br /> Client. Indian River County Attn:Mr Michael Nixon,P.E. 607 NW Commodity Cove <br /> Dunkelberger Proposal#• PHB161007 Port St.Lucie,Florida 34986 <br /> Date: Revised 3/2/2016 772 343-9787 FAX 772 343-9404 Contact: David T Youn strom <br /> Remainingon ContractContract Amount <br /> Itemized Services Qtyl Unit Price Amount Gty Amount Gty Aflieunt 4ty Ameunt Qty Amount <br /> Field Testing <br /> In-Place Density Testing' 870 test 1 $25.00 $21,750.00 9.06 $8-86 0 $6 09 9-99 $8 96 870 $21,750.00 <br /> "Four(4)test minimum per site visit. <br /> Laboratory Testing <br /> Proctor Test(T-1 80),FDR"" 22 each $90.00 $1,980.00 0 $9:90 6 $9-99 9 $6-69 22 $1,980.00 <br /> Proctor Test Embankment/Pipe Backfill/Agg Bas 5 each $9000 $45000 0 $0-09 0 $0-06 6 $0-00 5 $45000 <br /> Sieve Analysis of Fine and Coarse Agg(T-27) 22 each $7000 $1,54000 0 $0.09 6 $0.99 6 $6-06 22 $1,540.00 <br /> Limerock Bearing Ratio(LBR,FM-515) 10 each $300.00 $3,000.00 6 $0-06 0 $9-09 9 $6-06 10 $3,000.00 <br /> Concrete Compressive Strength(8 sets of 4 cylsi 8 each 1 $90.00 1 $720.00 0 $6-09 6 $6:09 0 $0.00 8 $720.00 <br /> The Proctor test for the FDR involves the laboratory density determination of the field-prepared FDR mixture with emulsions. <br /> Asphalt Plant Testing <br /> FDOT CTQP Certified Plant Inspector 0 hour $65.00 $0.00 6:08 $9-00 9 $9-99 0768 $84)9 0 $000 <br /> Engineering&Reporting <br /> Project Engineer/Project Manager 55 hour $9500 $5,22500 9 $0.06 6 $9-99 9 $8:88 55 $5,225.00 <br /> Professional Engineer/Sr Project Manager 15 hour $130.00 $1,950.00 0 $0.06 9 $8-99 6 $8:06 15 $1,950.00 <br /> Contingency Laboratory Testing <br /> FDR Mix Design Resilient Modulus Test 1 test $1,245.00 $1,245.00 6 $0-89 9 $8-09 0 $886 1 $1,245.00 <br /> Estimated Total $37,860.00 $&06 $0.66 $0.06 $37,860.00 <br /> PHB161007 Old Dixie Hwy FDR QA est—Rev 3-2-16.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.