My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-043
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2016 10:04:22 AM
Creation date
3/24/2016 10:04:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/22/2016
Control Number
2016-043
Agenda Item Number
8.C.
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.3 Ixora Park AC Water Main replacement
Area
Ixora Park
Project Number
4122
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
®r, Kimley-Horn and Associates, Inc. <br /> Kimley-Horn Project: Ixora Park Base Mapping for water utility <br /> and Associates, Inc. FILE NO. DATE 01/13/16 <br /> ESTIMATE COST: $34,100.00 SHEET 1 <br /> Survey <br /> Professiona Technician/ Geodetic Three Two Man - <br /> I Surveyor Project CADD Processing GIS GIS Analyst/ Man Two Man 2 GPS unit <br /> Task Description &Mapper Surveyor technician Technician Specialist Technician Crew Crew Crew Clerical Task Totals <br /> Research-recover and establish vertical control 1 8 1,04000 <br /> Research-recover and establish horizontal control 1 2 1 8 1 1,120 00 <br /> Recover right of way control monumentation for+-2 miles of <br /> right of way 2 40 4,96000 <br /> input plats for 8 subdivisions(Ixora Park Plat No. 1 through <br /> Ixora Park Plat No 7 and Eastview Gardens)into Cad to form <br /> the basemap for the topographic survey.219 subdivision Lots. <br /> Adjust plats based upon found monumentation. 41 20 20 24 7,420 00 <br /> Field location of the above ground improvements within the right <br /> of way +-2 miles <br /> 96 11,520 00 <br /> obtain rim and bottom elevations of+-28 sanitary sewer <br /> structures 3 16 2,160.00 <br /> download field files 8 64000 <br /> draft topgraphic survey in CADD 4 40 3,68000 <br /> 000 <br /> 000 <br /> 000 <br /> 000 <br /> 000 <br /> 000 <br /> QA/QC 8 4 <br /> 000 <br /> SUM OF HOURS 12 24 76 0 0 0 0 196 0 0 34,100 00 <br /> HOURLY RATE $135.001 $120.00 $80.001 $100.00 $120.001 $85.001$135.00 $120.001 $140.00 $4000 <br /> TOTALS THIS SHEET 1 $1,620.001 $2,880.001 $6,080001 $0.00 $0.001 $0.00 $0001 $23,520.00 $0.001 $0.00 $0 00 $34,100 00 <br /> MWISMSURVEY\PROPOSALSIXORA PARK Topographic Survey 1-13-16.xis <br />
The URL can be used to link to this page
Your browser does not support the video tag.