Laserfiche WebLink
®r, Kimley-Horn and Associates, Inc. <br /> Kimley-Horn Project: Ixora Park Base Mapping for water utility <br /> and Associates, Inc. FILE NO. DATE 01/13/16 <br /> ESTIMATE COST: $34,100.00 SHEET 1 <br /> Survey <br /> Professiona Technician/ Geodetic Three Two Man - <br /> I Surveyor Project CADD Processing GIS GIS Analyst/ Man Two Man 2 GPS unit <br /> Task Description &Mapper Surveyor technician Technician Specialist Technician Crew Crew Crew Clerical Task Totals <br /> Research-recover and establish vertical control 1 8 1,04000 <br /> Research-recover and establish horizontal control 1 2 1 8 1 1,120 00 <br /> Recover right of way control monumentation for+-2 miles of <br /> right of way 2 40 4,96000 <br /> input plats for 8 subdivisions(Ixora Park Plat No. 1 through <br /> Ixora Park Plat No 7 and Eastview Gardens)into Cad to form <br /> the basemap for the topographic survey.219 subdivision Lots. <br /> Adjust plats based upon found monumentation. 41 20 20 24 7,420 00 <br /> Field location of the above ground improvements within the right <br /> of way +-2 miles <br /> 96 11,520 00 <br /> obtain rim and bottom elevations of+-28 sanitary sewer <br /> structures 3 16 2,160.00 <br /> download field files 8 64000 <br /> draft topgraphic survey in CADD 4 40 3,68000 <br /> 000 <br /> 000 <br /> 000 <br /> 000 <br /> 000 <br /> 000 <br /> QA/QC 8 4 <br /> 000 <br /> SUM OF HOURS 12 24 76 0 0 0 0 196 0 0 34,100 00 <br /> HOURLY RATE $135.001 $120.00 $80.001 $100.00 $120.001 $85.001$135.00 $120.001 $140.00 $4000 <br /> TOTALS THIS SHEET 1 $1,620.001 $2,880.001 $6,080001 $0.00 $0.001 $0.00 $0001 $23,520.00 $0.001 $0.00 $0 00 $34,100 00 <br /> MWISMSURVEY\PROPOSALSIXORA PARK Topographic Survey 1-13-16.xis <br />