My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/16/2016
CBCC
>
Meetings
>
2010's
>
2016
>
02/16/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:58:40 AM
Creation date
4/6/2016 10:13:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/16/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(USPAP), used the sales comparison approach. In the opinion of A&W, the market value of the fee <br />simple real estate of the 83.14 acres +/- is $1,400,000. <br />CDM Smith's final report, included with this agenda as Attachment 1, is broken down into the <br />following categories: <br />1) Background and Purpose <br />2) County land use, zoning & off site improvement requirements <br />3) Environmental considerations <br />4) Geotechnical investigation <br />5) Permitting evaluation <br />6) Conceptual design <br />7) Engineer's opinion of probable cost <br />8) Recommendation <br />Background and Purpose <br />The Indian River County Department of Utility Services (IRCDUS) currently operates two water <br />treatment plants that use raw water from the Upper Floridan Aquifer. IRCDUS uses 15 wells (a 16th <br />well is pending construction to provide redundancy) to supply the plants. Based on various studies <br />from the St Johns River Water Management District (SJRWMD) and from County sponsored <br />investigative reports, other alternative sources have been explored for its drinking water supply. <br />Various studies and evaluations completed to date have resulted in the recommendation that <br />should an alternative supply be needed, the County pursue development of a surface water source. <br />When the 83 acre site next to the Osprey Marsh came on the market, it opened up the possibility of <br />using the site to store surface water due to its close proximity to existing infrastructure. CDM Smith <br />was hired to evaluate the environmental considerations, permitting requirements, geotechnical <br />conditions, access, land use and other technical requirements to assist the county in determining if <br />the site would be a good candidate for such a project. In addition to the project requirements, CDM <br />Smith put together an opinion of probable cost (OPC), based on a conceptual/ planning level design, <br />to determine if the project could be financially feasible. <br />The short time duration for the report/ agenda did not allow for any pre -applications meetings with <br />the regulatory agencies. Staff did undergo an Indian River County Technical Review Committee Pre - <br />Application process that is the basis for much of the following local requirements. It is strongly <br />suggested that should the process move forwa.rd, to meet with the regulatory agencies to better <br />identify and solidify their requirements for such a project. <br />County land use, zoning & off site improvement requirements <br />The 83 acre site is zoned RS -6 (single family residential), RM -6 (multi -family residential) and CL <br />(limited commercial), all with an L-2 land use classification (low density residential). The L-2 land use <br />designation allows for up to 6 residential units per acre, which is why the two previous developers <br />were looking to put up to 178 single family homes on the subject property. Under both the RS -6 <br />and RM -6 zoning districts, "limited public and private utilities" are considered a Special Exception <br />use. As such, no land re -designation is anticipated for the site, but a special exemption would be <br />F•\Utilities\UTILITY - Engineering\WATER\Alternative Water Supply\Portofino Preserve aka Blackstone 83 acre site\Due Diligence Report for BCC <br />02_16_2016\Agenda - Due Diligence Report and OPC for 83 acre site for BCC meeting 02_16_2016.docx Page 2 of 14 <br />100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.