My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/16/2016
CBCC
>
Meetings
>
2010's
>
2016
>
02/16/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 10:58:40 AM
Creation date
4/6/2016 10:13:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/16/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 2-1: Conceptual Layout -South County Reservoir Site, 925 5th Street SW <br />C®� Figure No 2-1 <br />;�� Conceptual Layout of the South County Reservoir Site, Oslo Road; Indian River County <br />FE? 20+6 <br />Use of the property as a reservoir would not generate significant daily trips to/from the site. Most <br />of the activity would be associated with trips from the South County Water Plant, just west of the <br />site. No buildings, offices or restrooms would be built on the site thus limiting the offsite <br />improvements to the ROW dedication as described previously. <br />Environmental Considerations <br />Section 3 of CDM Smith's report details the local, state and Federal requirements for determining <br />the types of wetlands and the mitigating impacts if those wetlands are disturbed as part of a <br />development project. In addition there is a potential presence of endangered or threatened species <br />that may exist on the site. Any and all determinations will need to be conducted with appropriate <br />regulatory staff and site visits/ground truthing. Such work was outside the scope of CDM Smith's <br />work order. Due to tight time constraints associated with the sale of the property, only desktop <br />evaluations based on best available data were used to indicate potential environmental concerns. <br />The presence and approximate extents of wetlands within the project site were determined based <br />on a desktop evaluation of United States Fish and Wildlife Service (USFWS) National Wetlands <br />Inventory (NWI) data, historic and current aerial photographs, National Resource Conservation <br />Service (NRCS) soils data, and SJRWMD land use and land cover data. Based on this desktop <br />evaluation the project site contains approximately 10 acres of freshwater scrub wetlands (Figure 3- <br />1). According to the NWI database, these wetlands are classified as palustrine scrub wetlands with <br />1:\Utilities\UTILITY - Enginee ring\WATER\Alternative Water Supply\Portofino Preserve aka Blackstone 83 acre site\Due Diligence Report for BCC <br />02_16_2016\Agenda - Due Diligence Report and OPC for 83 acre site for BCC meeting 02_16_2016 v2 cmc.docx Page 4 of 14 102 <br />T <br />s,.c= =_ "=- �_.=•_� .r_�as's-/ <br />-2l' RT ?FE <br />\ <br />F__- <br />�. <br />/ <br />'Tf4 w CFia•I <br />U'O< FEVE <br />I <br />_ <br />`P:LET <br />•`' <br />1 e <br />N <br />-OTE�,11%L SUF F:.,;E <br />�� <br />-RIZI-E <br />_. FROv C I''Er 1WH <br />f <br />Z <br />111111 i <br />rsTER ;ESEn: ,F <br />TO L+TERN. 'i � E _ <br />':•O D 330 <br />\`7< PVC nPE <br />I <br />i <br />- -�-- J <br />T•; EE IEC •:•, iFR e..CEis Ps9 <br />EJR :TX a E :M <br />� • �_ <br />1 1 <br />1 � <br />LEGEND <br />'l<' MA aXM; RW7 <br />DOLE 12` GATES—/ <br />nTCE P;:aAAY RL'M-fF-TAY fE".1CAi1C': <br />Fn- a- ICTX ,T, 5 <br />(Ul,P�vC3i <br />, <br />1 <br />1 A <br />1 \ <br />�f /�' 2: Tfi2 9 LiY05C::C FLR'L'. <br />< 1 <br />) • ' F <br />1 1 <br />�uPu+u ca,sr ::nv. a:E: <br />W' WE SEE -,-.E CMH.} <br />GHF'.EL C+F/,1G fRE+ <br />(IC vfHH:LEi�- <br />I <br />I + 1 E <br />1 1 1 1 1 <br />(5 C_. Ar.rs� <br />3' iT<3ll'E7 SHOALS <br />t • <br />� <br />I 1 <br />�VPA4TED GRAlq V+P.TE—APRyT <br />WN 'VVETER ELW 3:1 SLUE <br />\�.:-410, <br />T: EC OCCI,:AIL'J <br />• . <br />CZ�ISIVATl_'Y AM <br />�� nm :•G M:RAVS <br />F,T :crH -E 54 <br />1 , <br />(=.�; 1:nsi <br />© Uaf c4vSEWAM01 AREAS <br />P:`Y TCATIAL MJRPW DEED •A3. -){i3 <br />unffl EFSEvE-T <br />L <br />C®� Figure No 2-1 <br />;�� Conceptual Layout of the South County Reservoir Site, Oslo Road; Indian River County <br />FE? 20+6 <br />Use of the property as a reservoir would not generate significant daily trips to/from the site. Most <br />of the activity would be associated with trips from the South County Water Plant, just west of the <br />site. No buildings, offices or restrooms would be built on the site thus limiting the offsite <br />improvements to the ROW dedication as described previously. <br />Environmental Considerations <br />Section 3 of CDM Smith's report details the local, state and Federal requirements for determining <br />the types of wetlands and the mitigating impacts if those wetlands are disturbed as part of a <br />development project. In addition there is a potential presence of endangered or threatened species <br />that may exist on the site. Any and all determinations will need to be conducted with appropriate <br />regulatory staff and site visits/ground truthing. Such work was outside the scope of CDM Smith's <br />work order. Due to tight time constraints associated with the sale of the property, only desktop <br />evaluations based on best available data were used to indicate potential environmental concerns. <br />The presence and approximate extents of wetlands within the project site were determined based <br />on a desktop evaluation of United States Fish and Wildlife Service (USFWS) National Wetlands <br />Inventory (NWI) data, historic and current aerial photographs, National Resource Conservation <br />Service (NRCS) soils data, and SJRWMD land use and land cover data. Based on this desktop <br />evaluation the project site contains approximately 10 acres of freshwater scrub wetlands (Figure 3- <br />1). According to the NWI database, these wetlands are classified as palustrine scrub wetlands with <br />1:\Utilities\UTILITY - Enginee ring\WATER\Alternative Water Supply\Portofino Preserve aka Blackstone 83 acre site\Due Diligence Report for BCC <br />02_16_2016\Agenda - Due Diligence Report and OPC for 83 acre site for BCC meeting 02_16_2016 v2 cmc.docx Page 4 of 14 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.