Laserfiche WebLink
Alternative 1: <br />Remove Dock <br />. Estimated cost of removal (by marine contractor) <br />: $3,000 - $4,000 <br />. Removal would eliminate liability of unauthorized <br />structures not up to building code standards on <br />county -owned land acquired for ROW <br />Removal would eliminate traffic safety hazard of <br />facility use at the "T" intersection of Morningside <br />Drive and Jungle Trail (no drop-off or parking <br />opportunities) <br />Removal would still allow informal shoreline <br />access for canoe/kayak launch by area residents <br />Alternative 2: <br />Allow as a Community Dock <br />. A Community entity would need to be established <br />(no current HOA) for a County lease and be <br />responsible for: <br />• Managing access and use for subdivision -wide <br />demands <br />• Carrying liability insurance (insuring County) <br />• After -the -fact permitting (managing, <br />desi.9ning, permitting and completing required <br />modifications) <br />13,6 <br />