My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-003
CBCC
>
Ordinances
>
2010's
>
2016
>
2016-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 1:03:06 PM
Creation date
4/6/2016 1:02:52 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2016-003
Adopted Date
04/05/2016
Agenda Item Number
10.A.1.
Ordinance Type
Comprehensive Plan Amendment
State Filed Date
04\06\2016
Entity Name
Sanitary Sewer Sub-Element
Potable Water Sub-Element
Subject
Water and Sewer Service outside Urban Service Area
Cornerstone Church and Epic Missions to benefit
Codified or Exempt
Codified
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br />Potable Water Sub -Element Policy 5.7 <br />POLICY 5.7: Consistent with the policies of the Future Land Use Element of this plan, <br />centralized water service shall be limited to the following areas: <br />Areas within the Urban Service Area; <br />Areas where the county has legal commitments to provide facilities and services as of <br />the date of adoption of this plan; <br />Areas outside the Urban Service Area where at least a portion of the site is contiguous <br />to an Urban Service Area boundary as depicted on the Official Future Land Use Map <br />or, where located no more than 500 feet from an existing centralized potable water <br />main distribution line that is part of a looped system, or where an approved place of <br />worship or camp_ /retreat use existed on January 1, 2016 and is approved for water <br />and/or sewer service by Utility Services in conjunction with a utility <br />construction/connection permit filed with Utility Services on or before June 30, 2016. <br />These areas are subject to the following provisions: <br />O The maximum density of such land shall be as shown on the Official Future <br />Land Use Map, and the provision of centralized potable water service shall not <br />be justification for an increase in maximum density; <br />O Any and all costs associated with connecting a property to the potable water <br />system and providing for adequate fire protection, including costs associated <br />with survey, design, permitting, line extensions, construction, restoration, <br />inspections, and certifications, shall be borne by the owner of the property. <br />Development projects located outside of the Urban Service Area that meet the criteria <br />of the policies of the Future Land Use Element for: <br />O clustering of residential development within agricultural areas; <br />O clustering of residential development within privately owned upland <br />conservation areas; <br />O clustering development within mixed use districts; or <br />O traditional neighborhood design communities. <br />O public facilities such as public schools. <br />O agricultural businesses and industries (including biofuel plants) <br />Areas where, consistent with Potable Water Sub -Element Policy 2.4, the risk of <br />private well contamination is determined to be unacceptably high. <br />Bold Underline: Additions to Ordinance <br />Deleted Text from Existing Ordinance <br />FACommunity Development\Comprehensive Plan Text Amendments\October 2015, PW policy 5.7 and SS policy 5.8\POLICY 5.7 underline and strike-thru potable water sub-element-2015.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.