My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-049
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2016 11:14:22 AM
Creation date
4/7/2016 11:14:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/05/2016
Control Number
2016-049
Agenda Item Number
12.G.1
Entity Name
Carter Associates
Subject
Work Order No.1 Engineering Design Collier Creek Subdivision
Phase 1 Petition Water Assessment Project
Project Number
UCP 4125
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br /> EXHIBIT "A" <br /> Continued <br /> WORK ORDER NO. 1 <br /> (Engineering/Survey) Continuing Professional Surveying & Mapping <br /> Contract 1333, 2015-2016 <br /> CAI Job. No. 16-235S <br /> IR County Project No. UCP 4125 <br /> IR County Contract No. 1333 <br /> IR County Work Order No. 1 <br /> Project Limits: <br /> Approximately 8,700 feet +/- Survey of South Easy Street, Chello Av, Part of S. Fleming St., Becker Av., <br /> Charles Av., Part of Holden Av., And Part of Holden Ct. Rights of Ways. Services performed and located within <br /> parts of the Collier Creek Estates, Indian River County, Florida. <br /> Topographic Route Survey performed within part of Section 18, Township 31 South, Range 39 East, Indian <br /> River County, Florida. <br /> Project Scope: <br /> The SURVEYOR shall provide Professional Land Surveying services to include the following: <br /> 1.) Establish horizontal control based on Florida State Plane Coordinate System, East Zone, NAD 83/2007 <br /> and limited recovery of adjacent parcel corners; and establish vertical control network benchmarks along the <br /> subject corridor based on North American Vertical Datum of 1988 not to exceed 600 feet. <br /> 2.) Field observe and record vertical ground spot elevations within project corridor, 10' outside of approximate <br /> right way and all specific points (road pavement, inverts and bottom of structures, swales, etc.) and changes in <br /> contour within the subject corridor. <br /> 3.) Field observe and record all man-made above ground and natural features (over head electrical, valves, <br /> mail boxes, drive ways, culverts, utility risers, utility boxes, etc. <br /> 4.) Observe and record the existing,limits of vegetation, if any, within the project limits of the subject corridor. <br /> 5.) The route survey to be tied into the record plats of the Collier Creek Estates. <br /> Specific Notes: <br /> Method of horizontal and vertical observations by G.P.S., RTK (accuracy: horizontal 10mm+1 ppm (RMS), <br /> vertical 20mm+1 ppm (RMS)], North American Datum of 1983 / Adjustment of 2007, Florida State Plane <br /> Coordinates (East Zone-901) and North American Vertical Datum of 1988. <br /> Project Schedule: <br /> Work will commence on the receipt of the notice to proceed or approved work authorization. <br /> Completion and Final Deliverables: <br /> Five (5) paper "hardcopy" signed and sealed Topographic Route Survey Certificates and an AutoCAD drawing <br /> file with PDF formats will be provided. Field and office tasks will be completed in approximately forty-five (45) <br /> days. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.