2016-044B
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-044B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2016 1:21:39 PM
Creation date
4/13/2016 1:21:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/22/2016
Control Number
2016-044B
Agenda Item Number
8.D.
Entity Name
E&D Contracting Services
Subject
Central Regional Wastewater Treatment Facility
Headworks Rehabilitation
Area
Wastewater Treatment Facility
Bid Number
2016023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 3 CONTRACT TIME <br /> 31 Contract Times. The CONTRACTOR, shall be substantially completed with the <br /> following timeframe <br /> (a) Within 30 calendar days from effective date of Notice to Proceed, Contractor <br /> shall complete the following tasks <br /> 1 Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job. <br /> 3. Perform all photographic recording and documentation of conditions prior <br /> to construction <br /> 4 Locate all existing utilities in the area of work. <br /> 5. Submit and secure approval of shop drawings <br /> 6. Mobilize all labor, equipment, and materials. <br /> 7 Deliver and store all equipment and materials to the job site <br /> 8. Notify all utilities and other affected parties prior to initiating construction. <br /> (b) From 30 calendar days to 60 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Complete project scope listed in Section 030130. <br /> 2. Perform all testing. <br /> (c) From 60 calendar days to 75 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1 Restore all disturbed areas to their pre-construction condition <br /> 2 Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i e., Subparagraphs a, b, and c) constitutes <br /> Substantial Completion <br /> (d) From 75 calendar days to 90 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Clean up project area. <br /> 2. Remove all equipment and material from project site <br /> 3. Perform contract closeout procedures. <br /> Completion of all tasks outlined above (i.e., Subparagraphs a, b, c, and d) constitute <br /> Final Completion. <br /> 3 2 Liquidated Damages OWNER and CONTRACTOR recognize that time is of the <br /> essence of this Agreement and that OWNER will suffer financial loss if the work is not completed <br /> within the times specified in Paragraph 31 above, plus any extensions thereof allowed in <br /> accordance with Article 12 of the General Conditions. They also recognize the delays, expense <br /> and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the <br /> 00530-2 <br />