Laserfiche WebLink
Martin Luther King Walking Trail <br />Change Order No. 4 <br />DESCRIPTION OF ITEMIZED CHANGES <br />IRC No. 1413 <br />kem No. I Descri 'on of Chane Unit I Q..ntfty Untt Price I Price Increase Price Decrease <br />9 <br />Pipe Handrail/Guiderail (SteeO <br />LF <br />52 <br />65.00 <br />3,380.00 <br />CO#3 <br />Sod <br />SY <br />750 <br />2.55 <br />1912.50 <br />11 <br />Performance Turf Sod Bahia <br />SY <br />1 435.47 <br />2.55 <br />3,660.45 <br />WCD#2 <br />15" ADS <br />LF <br />1 40.0 <br />25.25 <br />1 1,010.00 <br />WCD#2 <br />Earthwork <br />CY <br />72 <br />12.00 <br />864.00 <br />WCD#2 <br />As haft <br />TN <br />5 <br />200.00 <br />1,000.00 <br />WCD#4 <br />FD(ed Bollards <br />EA <br />1 5 <br />265.00 <br />1,325.00 <br />WCD#4 <br />Lockable Bollards <br />EA <br />2 <br />260.00 <br />520.00 <br />WCD#4 <br />T de D Curb Short Load <br />FT <br />30 <br />35.00 <br />1,050.00 <br />FORCE ACCOUNT <br />10 000.00 <br />Subtotals <br />9,429.45 <br />15,292.50 <br />TOTAL CHANGE ORDER #4 <br />$5,863.05 <br />83 <br />FtPubrtc Works\ENGINEERING DIVISION PROJECTS\1413Manin Luther King Walking TraiMdminlagenda items\Change Order 041Change Order No. 4 Page 1 <br />