My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/01/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
03/01/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 11:05:07 AM
Creation date
4/14/2016 12:18:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/01/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Office of the OL -4 <br />INDIAN RIVER COUNTY <br />Joseph A. Baird, County Administrator <br />Michael C. Zito, Assistant County Administrator <br />ADMINISTRATOR <br />MEMORANDUM <br />TO: Members of the Board of County Commissioners <br />FROM: Joseph A. Baird <br />County Administrator <br />DATE: February 22, 2016 <br />SUBJECT: Vacation Compensation Consideration <br />DESCRIPTIONS AND CONDITIONS: <br />In June of 2011, Chris Mora, Public Works Director, entered the Florida Retirement System <br />Deferred Retirement Option Program (DROP). His required retirement date is May 31, 2016. <br />To comply with Administrative Policy Manual Number AM -502.1 (7) (policy attached), Chris is <br />required to use 20 days of vacation prior to May 31 ", or he will lose that earned benefit. This is <br />because his vacation leave accrual balance exceeds the maximum amount allowed to be paid in <br />lieu of taking the vacation. Three times in the past the Board of County Commission has granted <br />an exception to this policy as a result of special conditions. <br />The Public Works Director has staff he needs to hire and train to fill critical vacancies in his <br />Department; two of these positions are Division Head positions, and are important to ensure a <br />smooth transition plan for the Department. Because of this situation, I find it exceedingly <br />difficult to approve four weeks of vacation, but do not want Chris to have to forfeit this earned <br />benefit. <br />I hereby request authorization to pay Chris Mora, Public Works Director, for 20 days of accrued <br />vacation leave which exceed the maximum specified in the Indian River County Administrative <br />Policy. The total cost of this exception to the policy is $12,008.55 (breakdown attached). <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.