My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/01/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
03/01/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 11:05:07 AM
Creation date
4/14/2016 12:18:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/01/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Joseph A. Baird, <br />County Administrator <br />THROUGH: Christopher R. Mora, P.E. <br />Public Works Director <br />FROM: James D. Gray, Jr. <br />Coastal Engineer <br />SUBJECT: Release of Retainage - Work Order No. 3 Morgan & Eklund, Inc. <br />2015 Beach Profile Monitoring Surveys <br />DATE: February 16, 2016 <br />DESCRIPTION AND CONDITIONS <br />On October 1, 2013, the Board approved a contract with Morgan & Eklund, Inc. (M&E) for <br />Professional Land Surveying and Mapping Services for a one-year term. The Board amended the <br />contract on October 7, 2014 and again on September 15, 2015; renewing the contract until <br />September 30, 2016. M&E is the selected County Consultant for professional onshore/offshore <br />hydrographic surveying services. <br />On May 12, 2015, the Board approved Work Order No. 3 to this contract provided for services <br />related to annual hydrographic surveying (beach profile) for the Sector 3 and Sector 7 Beach <br />Restoration Projects and additional surveying to complete the 2014 countywide monitoring <br />program. The Board approved Work Order No. 3 amount was $51,750 and included 3 separate <br />tasks and 3 separate project accounts. To date all tasks are 100% complete. The total amount <br />of retainage withheld under Work Order No. 3 is $5,175 and is broken out by tasks as follows: <br />Task 1: 2015 Sector 3 Beach and Dune Restoration Project Post Construction Monitoring Survey <br />Task 1 totaled $17,825. The total amount of retainage withheld is $1,782.50. <br />Task 2: 2015 Sector 7 Post Construction Monitoring <br />Task 2 totaled $6,900. The total amount of retainage withheld is $690. <br />Task 3: 2015 Countywide Beach Monitoring <br />Task 3 totaled $27,025. The total amount of retainage withheld is $2,702.50 <br />FAPublic Work, s\JamesG\Sector 3\Morgan and Eklund Work Orders\Scope of Work 2015 - Work Order No 2\agenda <br />item -- WO No. 3 -- Morgan and Eklund Surveying 2015 -- Release of Retainage.docx <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.