Laserfiche WebLink
PAY APPLICATION <br />IRC PROJECT NO. 1213 - IRC ShootIng Range <br />rr SCHEDULED VALUE _ PREVIOUS APPLICATION THIS PERIOD TOTAL COMPLETED % MATERIALS ^} BALANCE TO FINISH <br />Iw... u.w_':.'1,..:.'w.siw'.','."=;.,?^-'C_i:^+«.i?n't:-i"::.E'c;t::is�: 5.••:i.;:l+3ti4vGK(1i"r;! lL•o,.�:ee,:.i .`fiE'.i�Et{51nR P,le�i� LLti:<1,'�nn,'M rY+L`.�'1 YOIIYITRY:i nF:.r�,neunl i.�lb I�OUAMTITY�'., firl'1;"JAinouiMFwY�IJ Nti?t'a,uMMvlalb:':�11w!,��nti,M�f%0' i:'�'M?.SOA .M�'n HT�YR�aNT1:�ti C11VITITV�:,"1 .��4[i: Vne"nl'�!,�11 <br />ROADWAY IMPROVEMENTS <br />101.1 <br />MOBILIZATION <br />1 <br />LS <br />5,000.00 <br />5,000.00 <br />1.00 <br />5,000.00 <br />0.00 <br />1.00 5,000.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />EROSION AND WATER POLLUTION PREVENTION <br />0.00 <br />1.00 5,700.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />104 <br />CONTROL <br />1 <br />LS <br />5,700.00 <br />5,700.00 <br />1.00 <br />5,700.00 <br />103 <br />RECORD DRAWINGS/AS-BUILT DRAWINGS <br />1 <br />LS <br />5,000.00 <br />5,000.00 <br />0.50 <br />2,500.00 <br />0.50 <br />2,500.00 <br />1.00 5,000.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />108 <br />N.P.D.E.S. PERMITTING <br />1 <br />LS <br />1,000.00 <br />1,000.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 0.00 <br />0% <br />0.00 <br />1.00 <br />1,000.00 <br />110-1 <br />CLEARING AND GRUBBING <br />0.4 <br />AC <br />6,415.00 <br />2,566.00 <br />0.40 <br />2,566.00 <br />0.00 <br />0.40 2,566.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />SUPPLIED) (CONTRACTOR TO HAUL MATERIAL FROM <br />170.00 <br />1,358.30 <br />350.00 2,796.50 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />120.6.2 <br />FAIRGROUNDS TO PROJECT SITE) <br />350 <br />CY <br />7.99 <br />2,796.50 <br />180.00 <br />1,438.20 <br />162-2 <br />PREPARED SOIL LAYER - TOPSOIL (6') SITE <br />1,600 <br />SY <br />1.99 <br />3,184.00 <br />800.00 <br />1,592.00 <br />800.00 <br />1,592.00 <br />1,800.00 3,184.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />430-34.321 ALUMINIZED CORRUGATED METAL PIPE (17) <br />38 <br />LF <br />55.00 1 <br />2,090.00 <br />30.00 <br />1,650.00 <br />0.00 <br />30.00 1,650.00 <br />79% <br />0.00 <br />8.00 <br />440.00 <br />550.10 <br />HOG WIRE FENCE 8 GATE (FURNISH AND INSTALL) <br />150 <br />LF <br />9.75 <br />1,462.50 <br />150.00 <br />1,462.50 <br />0.00 <br />150.00 1,462.50 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />PERFORMANCE TURF (HYDROSEED) (BAHIA) (INCLUDES: <br />600.00 <br />720.00 <br />1,600.00 1,440.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />573-1 <br />TOP SOIL FERTILIZER AND WATERING) <br />1,600 <br />SY <br />0.90 <br />1,440.00 <br />800.00 <br />720.00 <br />580 <br />RIFLE RANGE BAFFLES (REPAIR) <br />434 <br />LF <br />32.00 <br />132888.00 <br />434.00 <br />13,888.00 <br />0.00 <br />434.00 13,888.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />580.326.4 <br />MULCH WOOD CHIPS FOR TRAILS <br />100 <br />CY <br />38.00 <br />3,800.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 0.00 <br />0% <br />0.00 <br />100.00 <br />3,800.00 <br />590 <br />12' HIGH X 12" WIDE MASONRY WALL <br />138 <br />LF <br />284.00 <br />39,192.00 <br />138.00 <br />39,192.00 <br />0.00 <br />138.00 39,192.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />1.00 3,000.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />800 <br />PUBLIC CONSTRUCTION BOND <br />1 <br />LS <br />3,000.00 <br />3,000.00 <br />1.00 <br />3,000.00 <br />SUBTOT <br />SKEET AND TRAP FACILITY IMPROVEMENTS Altemele #2 <br />90 119.00 <br />SUBTOTAL <br />78 708.70 <br />SUBTOTAL <br />6 170.30 <br />SUBTOTAL 84 879.00 <br />AL <br />0.00 <br />SUBTOTAL <br />5 240.00 <br />FORCE ACCOUNT <br />ti 427.29 <br />1.00 <br />5,427.29 <br />1 <br />1.00 5,427.29 <br />-1.00 <br />0.00 <br />1.00 <br />645.00 <br />1.00 845.00 <br />-1.00 <br />3,727.71 <br />FORCE ACCOUNT <br />4,572.71 <br />1.00 <br />5,427.29 <br />0.00 <br />0.00 0.00 <br />OOIVl01 <br />0.00 <br />0.00 <br />0.00 <br />"E:`dr•J.:,.: <br />vl+,x'.rl�,..a (t{Tzii0,:•1, -"•i^' risrY!: <br />SKEET AND TRAP FACILITY IMPROVEMENTS Altemete #2 <br />TOTAL <br />100119.00 <br />TOTAL <br />84135.99 <br />TOTAL <br />7,015.30 <br />TOTAL 91 151.29 <br />0.00 <br />TOTAL <br />8 887.71 <br />AMOUNT COMPLETED TO DATE <br />S91,151.29 <br />$0.00 <br />MATERIALS STORED TO DATE <br />$91,151.3 <br />SUB -TOTAL <br />MATERIALS STORED <br />AND COMPLETE TO DATE <br />RETAINAGE. <br />OF WORK COMPLETED AT 10% <br />91151.29 <br />TOTAL <br />COMPLETED <br />AND STORED LESSRETAINAGE <br />573 723J9 <br />LESS PREVIOUS PAYMENT <br />W AMOUNT DUE CONTRACTOR <br />