My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-058
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 10:19:36 AM
Creation date
4/15/2016 10:19:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/12/2016
Control Number
2016-058
Agenda Item Number
12.F.1
Entity Name
CB&I Coastal Planning & Eng.
Subject
Sector 5 Beach Restoration Design / Engineering
Work Order No. 12
Area
Sector 5 Beach Property
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Task 2 —Joint Coastal Permit Pre-Application Meetings <br /> A Joint Coastal Permit (JCP) application will be developed and submitted to the Florida Department of <br /> Environmental Protection (FDEP) and US Army Corps of Engineers (USACE). We will request, prepare <br /> for, and lead a pre-application meeting with the FDEP. This meeting will be conducted via teleconference. <br /> We will provide a summary of the project along with readily available information required by the permit <br /> application, much of which will be included in the Preliminary Project Design and Feasibility Report. If <br /> sand placement is confined to the dune and above mean high water (MHW), we will request that the <br /> FDEP expedite the permitting process by considering the project through a Coastal Construction Control <br /> Line (CCCL) permit. <br /> The purpose of the meeting will be to describe the proposed project and determine the agencies' <br /> requirements for the pending permit application. Available information will be presented to the agencies <br /> to determine the sufficiency of the information for permit file development. <br /> A separate pre-application meeting will be held with the Federal permitting agency (USACE) and Federal <br /> commenting agencies (USFWS, NOAA-NMFS) Again, we will request, prepare for, and lead the <br /> meeting. Meetings with the Federal agencies are generally conducted via conference call. Based on the <br /> results of the meetings, the extent of the permit application requirements will be determined. <br /> Deliverables <br /> CB&I will request, prepare for, and lead two separate pre-application meetings Following the meeting, <br /> CB&I will compose minutes documenting the discussions and distribute the minutes to the County and <br /> the permitting agencies <br /> Schedule <br /> The pre-application meeting will be held upon completion of the draft feasibility report. The intent is to <br /> conduct the meeting concurrently with the County's review of the report so the comments from the <br /> permitting agencies can be included in the final feasibility report deliverables <br /> Cost <br /> The cost to facilitate and conduct the two pre-application meetings and compose minutes is $6,622 00 <br /> A breakdown of the hours and expenses to develop these costs is attached and follow the terms of CB&I's <br /> agreement with Indian River County <br />
The URL can be used to link to this page
Your browser does not support the video tag.