Laserfiche WebLink
-• ;..,� <br /> While construction plans are considered part of the JCP application,we will request that the FDEP require <br /> these as part of their Notice to Proceed item list. Development of final plans and specifications is not <br /> included in this proposal If CB&I's services are requested for these items, a separate work order will be <br /> proposed to the County <br /> Aerials collected by the County in the summer of 2015 and the edge of hardbottom delineated based on <br /> interpretation of those aerials will be used to support the permit application. <br /> We will develop a draft construction schedule for the County's review for inclusion in the permit <br /> application <br /> We will coordinate with local upland sand mines to obtain sufficient geotechnical information to support <br /> the JCP application. We will develop a Sediment QA/QC plan as necessary. <br /> We will describe the natural community within the project area based on the Environmental Assessment. <br /> We will develop Biological, Physical, and Mitigation Monitoring plans as necessary No additional field <br /> work is proposed as part of this effort. <br /> We will coordinate with the County and Ecological Associates regarding sea turtle nesting data and any <br /> wildlife surveys conducted on site. This data will be incorporated into the permit application. No <br /> additional field work is proposed as part of this effort. <br /> We anticipate that this project can be covered by the Statewide Programmatic Biological Opinion (SPBO). <br /> We will coordinate with USFWS regarding any additional information required to apply the Biological <br /> Opinion. The SPBO does not include consultation on piping plovers Separate consultation on piping <br /> plovers may be required. It is anticipated that consultation with National Marine Fisheries Service(NMFS) <br /> will be required in order to determine appropriate reasonable and prudent measures, terms and <br /> conditions and conservation measures for sea turtles, smalltooth sawfish, loggerhead critical habitat and <br /> listed coral species. <br /> We will explain how the project will affect the coastal system It is envisioned that the Preliminary Project <br /> Design and Feasibility Report will provide much of the support for this portion of the permit application <br /> discussion <br /> We will describe the envisioned construction methodology and how turbidity control measures will be <br /> instituted to minimize adverse effects to water quality. We will also explain methods to protect threatened <br /> and endangered species. <br /> The County will be responsible for the JCP application fee. This cost is not included in CB&I's cost for <br /> this work. <br /> We will follow guidance provided by the FDEP with respect to the filing convention and submittal <br /> requirements. We will follow-up with the FDEP to ensure receipt and distribution of the JCP application. <br /> We will also document the timeline for review and attempt to provide unofficial responses when and <br /> where possible to avoid Requests for Additional Information <br /> I <br />