Laserfiche WebLink
UUMNS <br /> The following deliverables will be provided to the County(Tasks 1-5, Task 3a is included in Task 3): <br /> A. Task 1 - County coordination meeting minutes, <br /> B. Task 2 and 3 —30% Conceptual Roadway and Traffic Signal Plans(3 hardcopies and 1 pdf), <br /> C. Task 4—Notice to Utility Providers(pdf copy), <br /> D. Task 3 —Results of SUE(pdf copy), <br /> E. Task 2 and 3 —75% Construction Drawings(Roadway Plans and Traffic Signal Plans), <br /> Specifications and Cost Estimate(3 hardcopies and 1 pdf), <br /> F. Task 4—SJRWMD Permit Exemption Request(pdf copy), <br /> G. Task 2 and 3 — 100% Construction Drawings(Roadway Plans and Traffic Signal Plans), <br /> Specifications and Cost Estimate, response to County Comments(3 hardcopies and 1 pdf), <br /> H. Task 5 - Issue for Bid Documents (Roadway Plans and Traffic Signal Plans, Specifications <br /> and Cost Estimate(3 hardcopies and 1 pdf). <br /> March 23,2016 <br /> Page 9 of 10 <br />