Laserfiche WebLink
MAN HOUR BREAKDOWN <br /> Project: IRC-GEC- Project 1305-CR 512 DATE: 3/23/2016 <br /> Myrtle St to 125th Ave <br /> BY: J H W <br /> PROGRAM <br /> TASK DESCRIPTION MGR SR ENG III/PM SR ENG I ENG I CAD DESIGNER <br /> Task 1 -Existing Conditions Review <br /> Site Visit/project walk walk 8.0 8.0 <br /> Survey review 1 4.0 <br /> County Meeting and minutes 1 2.0 1 4.0 4.0 <br /> Subtotal 20 12.0 80 8.0 0.0 <br /> Task 2- Roadway Plans <br /> Project Management 12.0 70.0 <br /> County Meetings 3 separate)and minutes 16.0 <br /> Roadway Analysis and Design 8.0 40.0 8.0 <br /> Utility Coordination 4.0 20.0 8.0 <br /> Construction Drawings, CAD and Review 8.0 12.0 24.0 200.0 <br /> Cost Estimates 75%and 100% 4.0 24.0 24.0 <br /> Technical Specs 8.0 24.0 160 <br /> QAQCJ 8.0 1 24.0 240 16.0 <br /> Subtotal 20.0 142.0 1440 80.0 2160 <br /> Task 3-Si nalization Plans <br /> 'SUE SUBCONTRACTED <br /> Base Mapping 6.0 <br /> Utility Coordination 4.0 8.0 24.0 16.0 <br /> Si nalization Analysis and Plans 6.0 24.0 32.0 720 1 88.0 <br /> Mast Arm Structural Review 14.0 <br /> Si nalization QAQC 4.0 8.0 24.0 8.0 180 <br /> Subtotal 100 50.0 64.0 104.0 128.0 <br /> Task 3a-Strain Pole Structural <br /> SUE SUBCONTRACTED <br /> Strain Pole Utility Coordination 2.0 6.0 4.0 8.0 <br /> Strain Pole Analysis and Design, 1.0 40 12.0 160 8.0 <br /> Strain Pole QAQCJ 1.0 2.0 1 4.0 4.0 40 <br /> Subtotal 20 8.0 22.0 24.0 20.0 <br /> Task 4- Permitting <br /> IRC-30%Submital 4.0 40 8.0 <br /> IRC-75%Submital 12.0 60 24.0 <br /> IRC- 100%Submital 60 8.0 8.0 <br /> SJRWMD exemption request 2.0 4.0 2.0 <br /> NTUP Notice and coord meeting 4.0 8.0 8.0 <br /> Subtotal 0.0 28.0 30.0 8.0 42.0 <br /> Task 5-Bid Phase Services <br /> IFB Dw s, specs, bid schedule, cost estin 2.0 14.0 16.0 8.0 <br /> Pre Bid Meeting 80 8.0 <br /> Bid RFI's 8.0 80 <br /> Bid Review and Recommendation 8.0 16.0 <br /> Subtotall 2.0 1 380 1 480 0.0 8.0 <br /> TOTAL HOURS 360 278.0 1 3160 224.0 1 414.0 <br />