My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-062
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 11:49:22 AM
Creation date
4/20/2016 11:49:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/19/2016
Control Number
2016-062
Agenda Item Number
8.H.
Entity Name
Atkins North America Inc.
Subject
Work Order No.3 County Road 512 Project
Area
CR 512. Myrtle St. to 125th Ave.
Project Number
1305
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAN HOUR BREAKDOWN <br /> Project: IRC-GEC- Project 1305-CR 512 DATE: 3/23/2016 <br /> Myrtle St to 125th Ave <br /> BY: J H W <br /> PROGRAM <br /> TASK DESCRIPTION MGR SR ENG III/PM SR ENG I ENG I CAD DESIGNER <br /> Task 1 -Existing Conditions Review <br /> Site Visit/project walk walk 8.0 8.0 <br /> Survey review 1 4.0 <br /> County Meeting and minutes 1 2.0 1 4.0 4.0 <br /> Subtotal 20 12.0 80 8.0 0.0 <br /> Task 2- Roadway Plans <br /> Project Management 12.0 70.0 <br /> County Meetings 3 separate)and minutes 16.0 <br /> Roadway Analysis and Design 8.0 40.0 8.0 <br /> Utility Coordination 4.0 20.0 8.0 <br /> Construction Drawings, CAD and Review 8.0 12.0 24.0 200.0 <br /> Cost Estimates 75%and 100% 4.0 24.0 24.0 <br /> Technical Specs 8.0 24.0 160 <br /> QAQCJ 8.0 1 24.0 240 16.0 <br /> Subtotal 20.0 142.0 1440 80.0 2160 <br /> Task 3-Si nalization Plans <br /> 'SUE SUBCONTRACTED <br /> Base Mapping 6.0 <br /> Utility Coordination 4.0 8.0 24.0 16.0 <br /> Si nalization Analysis and Plans 6.0 24.0 32.0 720 1 88.0 <br /> Mast Arm Structural Review 14.0 <br /> Si nalization QAQC 4.0 8.0 24.0 8.0 180 <br /> Subtotal 100 50.0 64.0 104.0 128.0 <br /> Task 3a-Strain Pole Structural <br /> SUE SUBCONTRACTED <br /> Strain Pole Utility Coordination 2.0 6.0 4.0 8.0 <br /> Strain Pole Analysis and Design, 1.0 40 12.0 160 8.0 <br /> Strain Pole QAQCJ 1.0 2.0 1 4.0 4.0 40 <br /> Subtotal 20 8.0 22.0 24.0 20.0 <br /> Task 4- Permitting <br /> IRC-30%Submital 4.0 40 8.0 <br /> IRC-75%Submital 12.0 60 24.0 <br /> IRC- 100%Submital 60 8.0 8.0 <br /> SJRWMD exemption request 2.0 4.0 2.0 <br /> NTUP Notice and coord meeting 4.0 8.0 8.0 <br /> Subtotal 0.0 28.0 30.0 8.0 42.0 <br /> Task 5-Bid Phase Services <br /> IFB Dw s, specs, bid schedule, cost estin 2.0 14.0 16.0 8.0 <br /> Pre Bid Meeting 80 8.0 <br /> Bid RFI's 8.0 80 <br /> Bid Review and Recommendation 8.0 16.0 <br /> Subtotall 2.0 1 380 1 480 0.0 8.0 <br /> TOTAL HOURS 360 278.0 1 3160 224.0 1 414.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.