My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-003
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2018 12:29:31 PM
Creation date
4/25/2016 10:47:45 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/06/2015
Control Number
2015-003
Agenda Item Number
8.I.
Entity Name
Schulke, Bittle and Stoddard
Subject
Work Order No.1 Central Wastewater Treatment Plant
Headworks
Area
Gifford
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineer's Conceptual Cost Estimate <br />Central WWTP Head Works Restoration <br />1 <br />Install mechanical plug and <br />reconfigure pipes/valves to bipass <br />headworks <br />LS <br />1 <br />$2,500.00 <br />$2,500.00 <br />2 <br />Clean/pressure wash and prep <br />channels <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />3 <br />Restore walls/floors/ceiling <br />SF <br />3354 <br />$20.25 <br />$67,918.50 <br />4 <br />Concrete restoration <br />SF <br />429 <br />$52.50 <br />$22,522.50 <br />5 <br />Replace gates <br />EA <br />2 <br />$10,000.00 <br />$20,000.00 <br />6 <br />Remove corrosion/clean, paint <br />misc. appurtenances <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />$137,941.00 <br />Contingency <br />10% <br />$13,794.10 <br />Grand Total: <br />$151,735.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.